Relocated / Occupant owned task lighting

CI-2009 EAp2: Minimum Energy Performance
posted by Michael Smithing on Oct 14, 2015, 2:18 am

Our project does not include task lighting; however several users have brought existing task lighting with them from the previous premises to the new premises. It is unclear whether the task...

Last reply: Marcus Sheffer, Oct 15, 2015, 4:11 pm

Light meter phone apps

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Ben Thompson on Oct 19, 2015, 11:06 am

Hi all,

I'm going to do the measurement method for the first time, and was looking into using a light meter app on my phone to do it- would this be acceptable? Does anyone have any...

Last reply: Joyce Kelly, Oct 29, 2015, 12:27 pm

cutsheets

NC-2009 MRc5: Regional Materials
posted by Jian Hui Liu on Oct 21, 2015, 11:45 pm

Clearly i know the project team should provide cutsheets for the materials to support regional materials claims,but i cannot get the meaning of "cutsheets".Which kind of information the cutsheets...

Last reply: Jian Hui Liu, Oct 28, 2015, 4:10 am

Compare impacts of materials and energy

NC-v4 MRc1: Building life-cycle impact reduction
posted by Jody Lee Potvin-Jones on Oct 22, 2015, 5:29 am

Hi,
We are studying a building in Saudi Arabia that has a fully glazed facade shaded with an exterior facade system made of ultra high performance concrete. The shading decreases the direct...

Last reply: Charalampos Giannikopoulos, Nov 12, 2015, 7:35 am

Gym Floor Paints

Schools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatings
posted by Shelley White on Oct 23, 2015, 9:06 am

Does anyone know if the graphic arts coating...

Last reply: Jon Clifford, Oct 29, 2015, 8:07 pm

Expected Waste Volume

CS-2009 MRp1: Storage and Collection of Recyclables
posted by Saud Abdul Rasheed on Oct 24, 2015, 8:02 am

Hi all,
Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the...

Last reply: Saud Abdul Rasheed, Dec 30, 2015, 10:45 pm

Space Usage- Occupant Type

NC-2009 PIf3: Occupant and Usage Data
posted by Akshat Patel on Oct 26, 2015, 2:39 pm

I'm having trouble deciding what to mark for the first item in the form: Occupant Type.

My project is a hotel new construction. I was thinking of checking the box for "Other:" and writing...

Last reply: Akshat Patel, Oct 28, 2015, 10:50 am

FSC Mix cabinet with Recycled content

NC-2009 MRc7: Certified Wood
posted by Indochine Engineering VN on Oct 28, 2015, 4:19 am

Hi, one kitchen supplier showed me their...

Last reply: Lori Knosalla, Oct 29, 2015, 4:27 pm

Checklist states 2 points possible

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Parker williams on Oct 28, 2015, 5:56 pm

Are you allowed to do both options for this credit? 2 points possible or 1?

Last reply: Trista Brown, Oct 29, 2015, 5:14 pm

Catering Kitchen

NC-2009 IEQc6.1: Controllability of systems - lighting
posted by Heather Holdridge on Nov 2, 2015, 11:01 am

I recently had this credit denied by our LEED review team because our catering kitchen "local control" did not meet the credit requirement for adjustability. The catering kitchen has simple on-...

Last reply: Heather Holdridge, Apr 17, 2017, 12:11 am