Topic | Recent |
---|---|
LEED for Schools- Bike Lane Req. (Sorry for Cross Posting)NC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Jean Marais on Nov 3, 2011, 4:42 am
Daycare Center - Bike Racks on Lot Boundry My Bicycle Parking Racks are located on the Lot Boundry. On the otherside of the fence, through the always open gates is the public side walk.... Last reply: David Posada, Nov 14, 2011, 2:00 am |
|
residential or commercialGeneral forumsposted by Tristan Roberts on Nov 14, 2011, 12:59 amDavid Posada Integrated Design & LEED Specialist SERA Architects LEEDuser Expert 1980 thumbs up November 14, 2011- 1:52 am Jim, "residential" and "commercial" can mean different things depending on the context- whether you are trying to pick the appropriate LEED Rating system, say NC vs. Homes, figuring out the appropriate zoning code, or the appropriate energy code/ standard. Im not sure what you were referring to when you mentioned system 1 or 7, so if you need detailed help on EAc1 you may want to post on the forum for that credit. As a general answer, the commercial... Last reply: David Posada, Nov 14, 2011, 1:52 am |
|
Attached Buidlings/LEED Project BoundaryGeneral forumsposted by Lauren Ford on Sep 13, 2011, 8:56 am
We have an existing parcel of land with one small existing restaurant on it (not LEED Certified). We are building a large hotel/inn (that will pursue LEED NC Certification) on the same parcel... Last reply: David Posada, Nov 14, 2011, 1:28 am |
|
revising submissionGeneral forumsposted by Tristan Roberts on Nov 14, 2011, 1:03 am
Roxanne, sorry for the slow response here. You would want to revise the submission at this point in the game, for sure. |
|
MPRsGeneral forumsposted by Tristan Roberts on Nov 14, 2011, 1:02 am
Sita, if you are not already familiar with the LEED Minimum Program Requirements, including the supplemental guidance, I would start by studying that document. |
|
responseGeneral forumsposted by Tristan Roberts on Nov 14, 2011, 12:53 am
Steven, sorry we weren't able to get you a response here. Honestly, I think I would have deferred to GBCi on this. What ended up happening? |
|
passwordGeneral forumsposted by Tristan Roberts on Nov 14, 2011, 12:51 am
Vassil, I"m not sure. I would contact... |
|
owner required signatoryGeneral forumsposted by Tristan Roberts on Nov 14, 2011, 12:48 am
P, this makes sense to me. You are the owner of the project. |
|
New construction, catering facilitiesGeneral forumsposted by Carlos Alberto Hoyos Soto on Sep 28, 2011, 9:09 am
Hello, Last reply: Tristan Roberts, Nov 14, 2011, 12:27 am |
|
2 phases buildingGeneral forumsposted by Roger Moquin on Sep 15, 2011, 4:02 pm
My case is almost similar of the "U" building of Roberto Meza, but we dont want to certify the second phase. The second phase is expected to start one year after the achievement of the first... Last reply: Tristan Roberts, Nov 14, 2011, 12:16 am |