Sensor based lavatory faucet compliance

NC-2009 WEp1: Water Use Reduction
posted by Faisal on Dec 10, 2014, 6:41 am

Hi,
How should be the compliance (of 0.25gpc) for sensor based lavatory faucet be checked if the manufacturer mentions only “ adjustable from 1 - 20 minutes “ , the model in question is...

Last reply: Faisal, Dec 12, 2014, 10:05 am

Existing Building Fenestration

NC-2009 EAp2: Minimum Energy Performance
posted by Charalampos Giannikopoulos on Dec 11, 2014, 12:14 pm

According to ASHRAE 90.1-2007 Table G3.1.5 (f) for existing building envelopes, the baseline building design shall reflect existing conditions prior to any revisions that are part of the scope of...

Last reply: Marcus Sheffer, Nov 30, 2015, 11:38 am

"Single Site" requirement for a Master Site?

LEED Guidance for Campuses and Multiple Buildings
posted by Richard Barlow on Dec 15, 2014, 11:16 am

We are working on a 30+ acre medical campus for a single developer. There will be a total of 9 buildings in this development, and all buildings will pursue LEED certification. I am trying to...

Last reply: Richard Barlow, Dec 22, 2014, 2:18 pm

water use per instrument tray requirements table

Healthcare-v4 WEp2: Indoor water use reduction
posted by Michael Burton on Dec 17, 2014, 1:10 pm

LEED v4 has a table (table 4) on page 58 that stipulates specific numbers of gallons of water allowable to either sterilize or wash in instrument tray. can anyone comment from where these values...

Last reply: Michael Burton, Jun 11, 2015, 3:43 pm

Hot-Rolled Structural Steel- MRc4 Products

NC-2009 MRc4: Recycled Content
posted by Robert East on Dec 18, 2014, 12:38 am

thumbs up December 19, 2014- 9:22 am Keith- Thanks so much for monitoring and contributing to this forum!! Your response is spot on. I just wanted to note that the default recycled content value for steel...

Last reply: Andrew Tse, Dec 22, 2014, 10:25 am

Process load significantly lower than 25%

NC-2009 EAp2: Minimum Energy Performance
posted by Panupant Phapant on Dec 18, 2014, 2:20 am

The overall process load of our project turns out to be in the vicinity of 15% only. We are aware that 15% is absurdly low and unusual for plants. The factory owner, nevertheless, sent us a full...

Last reply: Jean Marais, Dec 19, 2014, 8:43 am

Signatory requirements (Does engineer need to be PE?)

NC-2009 EAp2: Minimum Energy Performance
posted by Matt Dem on Dec 24, 2014, 1:17 pm

Shall the person who enters his/her initials under signatory section ( for example EAp2-1, 2-2, 2-3 ) be registered mechanical engineer (PE) ? If so, can you please let me know where this...

Last reply: Jon Clifford, Dec 27, 2014, 1:20 pm

revising LEED boundary on old project (LEED NCv2.2)

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Courtney Royal on Jan 2, 2015, 2:22 pm

may be problematic if you cannot get documentation for the entire site. Finally, this post is in the NC-2009 MPR3 forum, but LEEDv3 MPRs do not apply to v2.2 projects. NCv2.2 boundary rules were a bit...

Last reply: Jon Clifford, Jan 8, 2015, 7:30 am

Mid Review Clarification of LEED Project Boundary

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by Nicholas Klever on Jan 6, 2015, 5:06 pm

We have submitted an addition project for Design and Construction review under the new construction and renovation system. We just recently received a mid review clarification requesting to...

Last reply: RETIRED, Jan 7, 2015, 4:41 pm

Metered Lavatory Defaults

NC-2009 WEp1: Water Use Reduction
posted by Denise Dauplaise on Feb 12, 2015, 9:26 am

Through a series of circumstances, we are in the appeal process to try and meet WEp1. We have determined that we can either spend a significant amount of money to install two additional urinals...

Last reply: Michelle Robinson Schwarting, Feb 12, 2015, 3:44 pm