Log in
Forum
Topic

NC 2009 or v4 Multifamily Midrise

LEED Rating System Selection
posted by Timothy Schmitt on Sep 11, 2014, 4:27 pm

Hi,
I'm working on a mid-rise residential development that includes residential units & parking. There are two adjoined buildings. Six floors above grade w/ one below (lower level...

Last reply: Emmanuel Pauwels, Nov 5, 2014, 6:49 am

Status of covered outside space and Energy Modeling

NC-2009 EAc1: Optimize Energy Performance
posted by Amanda Johnson on Sep 15, 2014, 12:26 pm

Hello,
We are working on a mixed use project with a glass-covered outdoors space that fills the void between 3 different buildings (hotels, conference and restaurant). The space will be...

Last reply: Amanda Johnson, Sep 18, 2014, 11:31 am

VRP Compliance Calculator in Appendix

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Lawrence Lile on Sep 15, 2014, 6:39 pm

I am trying to understand the VRP Compliance Calculator at the end of the template. I have completed the 62MZCalc spreadsheet, and it comes up with one answer for 30% increased ventilation. Our...

Last reply: Michelle Robinson Schwarting, Sep 16, 2014, 6:33 am

Change of Fundamental Commissioning Agent

NC-2009 EAp1: Fundamental Commissioning of Building Energy Systems
posted by Ilana Judah on Sep 16, 2014, 9:28 am

We are working on a project that is now under construction. Fundamental Commissioning was started by one party, with Enhanced Commissioning being undertaken by a second party. The owner has now...

Last reply: Craig Graber, Nov 11, 2022, 11:01 am

treating stored rainwater?

NC-2009 SSc6.2: Stormwater design - quality control
posted by Carrie Laurendine on Sep 16, 2014, 6:25 pm

we have a tank in our project that will store rainwater. because our landscape theoretically doesn't require irrigation, it seems this cistern would only serve the purpose of SSc6.1

I...

Last reply: Lyle Axelarris, Sep 17, 2014, 12:52 pm

Local Jurisdiction Approval?

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Marina Andrade on Sep 18, 2014, 7:22 am

Hi,

What is "the local jurisdiction approval"?

You know what this is? How do I get this approval? With the designer?

I've worked in other certificate were accepted sizing...

Last reply: Marina Andrade, Sep 18, 2014, 1:34 pm

Short-term bicycle

NC-v4 LTc6: Bicycle facilities
posted by Flavia Marques on Sep 25, 2014, 10:39 am

does any one know what is the difference between the cycle racks provided for short term and long term storage (i don't mean percentage wise)?
I work on a stadium which 6 times in a year...

Last reply: Sue Bryant, Feb 26, 2018, 10:35 am

Required Manufacturer Documentation for Option 3

NC-v4 MRc4: Building product disclosure and optimization - material ingredients
posted by Randy Van Straaten on Sep 25, 2014, 12:41 pm

be talking about it. Until they make it public, however, I'm afraid that I'm not allowed to share more specifics in this public forum.In the meantime, if you want to get a sense of the direction...

Last reply: Paula Melton, Oct 22, 2015, 8:10 am

Modeling Heat Reclaim in EAp2 v2009

NC-2009 EAp2: Minimum Energy Performance
posted by Mario S. on Sep 30, 2014, 2:17 am

Hello,

We are working on a project that uses heat reclaim as a source of energy for service hot water. Heat is reclaimed from the flue gases of a generator set that is used to complement...

Last reply: Marcus Sheffer, Oct 4, 2014, 4:56 pm

Good news from GBCI!

Healthcare-v2009 MRc3: Sustainably sourced materials and products
posted by Mara Baum on Oct 3, 2014, 2:57 pm

I just got the word that...

Last reply: Mara Baum, Jan 20, 2016, 12:44 pm