Log in
Forum
Topic

LEED and Ergonomics

Pilot-Credits EQpc44: Ergonomics approach for computer users
posted by Linda Miller on Sep 22, 2011, 4:47 pm

Seeking your Input:

Does your organization have a policy pertaining to Leadership in Energy and Environmental Design (LEED)? This study may be for you, we are examining how ergonomics is...

Garage and technical rooms

NC-2009 IEQc5: Indoor Chemical and Pollutant Source Control
posted by BH . on Aug 30, 2011, 10:01 am

Hello,

We are dealing with project with underground garage, where adjacent spaces are technical rooms. Can we transfer the air from the garage to the technical rooms to ventilate them? Do...

Last reply: Dylan Connelly, Sep 22, 2011, 3:01 pm

Option 1: Full Flush-out Before Occupancy- Is there a Min. CF?

CI-2009 IEQc3.2: Construction IAQ management plan - before occupancy
posted by Michelle Bracewell-Musson on Aug 4, 2011, 10:50 am

With Option 1, Path 1, we are expected to flush-out 14,000 cf/sf of outdoor air at 60 degrees temp. and 60% humidity min. Is there a minimum ventilation rate as with Path 2 which is 0.30 cf/min...

Last reply: Dylan Connelly, Sep 22, 2011, 11:37 am

Public LEED Project Directory

General forums
posted by Amber Sausen on Sep 21, 2011, 6:38 pm

Did you look at the certified project directory provided by USGBC? http://www.usgbc.org/LEED/Project/CertifiedProjectList....

Last reply: Sheela I, Sep 22, 2011, 11:34 am

Outdoor Air Delivery Monitoring System installed post-occupancy

CI-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Philip Herriges on Aug 23, 2010, 6:22 pm

Our building owner is having a building-wide outdoor air delivery monitoring system installed throughout the building (not just in the LEED-tenant area of our project) but it won't be installed...

Last reply: Dylan Connelly, Sep 22, 2011, 11:24 am

Non-Densely Occupied Spaces Served by Existing AHU

CI-2009 IEQc1: Outdoor Air Delivery Monitoring
posted by Michelle Ruda on Sep 20, 2011, 2:33 pm

If you have non-densely occupied spaces served by an existing...

Last reply: Dylan Connelly, Sep 22, 2011, 11:20 am

CI on site Green Power?

CI-2009 EAc4: Green Power
posted by Robin Hurt on Aug 17, 2011, 3:27 pm

Is it possible to install onsite...

Last reply: Tristan Roberts, Sep 22, 2011, 12:53 am

REC vendors for Singapore Project

CI-2009 EAc4: Green Power
posted by Yong Lee Low on Aug 25, 2011, 6:46 am

For our Singapore projects, we need to buy...

Last reply: Lana Malone, Sep 21, 2011, 4:18 pm

Green Power for LEED-CI Retail

CI-2009 EAc4: Green Power
posted by Linda Davisson on Aug 22, 2011, 11:48 am

Can anyone confirm that Green Power is 2 points for LEED-CI Retail instead of 5 points for LEED-CI? That is what the LEED-CI Retail rating system indicates, but it is such a significant...

Last reply: Lana Malone, Sep 21, 2011, 4:17 pm

Who Can Execute an REC Contract with Vendor

NC-2009 EAc6: Green Power
posted by Elliot Powers on Aug 12, 2010, 1:50 am

I haven't found anywhere in the LEED-NC 2009 Ref. Guide that stated which party has to execute the...

Last reply: Marcus Sheffer, Sep 21, 2011, 2:22 pm