Forum quick links
G3.1.10 (d) "Heating only System"
NC-2009 EAp2:Minimum Energy Performanceposted by Anil Bhari on
Based upon G3.1.10 (d) “Where no cooling system exists or no cooling system has been specified, the cooling system shall be identical to the system modeled in the baseline building” Does this mean
LEED male/female 50/50 gender ratio
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Razan Nejem on
Hi Everyone, Regarding one of the FAQ's above in the birds eye view section with regards to gender ratio.
Sustainable furniture cost >100% total furniture cost
Healthcare-v2009 MRc5:Furniture and medical furnishingsposted by Catherine Adams on
According to the Healthcare reference guide under MRc5 Section 8 Examples: "furniture that meets the criteria for more than one option can be counted twice".
direct reading instruments
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Kelly Bruvik on
Can direct reading instruments be used to measure VOCs and PM10? Another user asked specifically about the GrayWolf IAQ equipment and I was also wondering if it can be used for EQc3.2.
Validity of the agreement
Schools-2009 SSc10:Joint Use of Facilitiesposted by Maya Karkour on
Dear All, Our project has a signed agreement with a nearby university, valid until June 2013.
Simple LEED boundary question
NC-2009 PIf2:Project Summary Detailsposted by jack larson on
My LEED boundary consists of the following: a) A Commercial building b) Three small service buildings ( one which is a substation ) c) A swimming pool d) A tennis court My question is as follows
Saving percentage round up to the nearest integer?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
Will LEED round up the saving percentage to the nearest integer? e.g. 19.8% to 20%? Thanks in advance
Epoxy floor. Testing laboratories
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Irina Charkina on
Hello, We have a project in Russia under LEED for CS-2009 sertification. There are technical rooms with epoxy flooring. 1) Can anybody confirm if I am wrong or right?
Envelope Commissioning for a Major Renovation
NC-v4 EAc1:Enhanced commissioningposted by Eleni Tsivitzi on
Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.
LEED CI - deadline for submitting documentation
posted by Devanand Ragbir on
We registered the Project for LEED CI. A space of about 2000 sqft. As the space was small the client was able to outfit the space in 3 weeks time and occupied the space immediately after.