Topic | Recent |
---|---|
Pilot Credit 5 & 6Pilot-Credits PC6: Integrative Project Planning & Designposted by Jill DeMarotta on Aug 6, 2010, 4:02 pm
Has anyone finished with the Pilot Credit 5&6? Was your credit accepted? Last reply: Jill DeMarotta, Sep 30, 2010, 3:32 pm |
|
Common area toiletsCI-2009 WEp1: Water Use Reductionposted by William Stangeland on Oct 14, 2009, 1:09 pm
Requiring tenants to include... Last reply: Karen Blust, Sep 30, 2010, 12:32 pm |
|
Local zoning requirementsCS-2009 SSc5.2: Site development - maximize open spaceposted by javier bolanos zeledon on Sep 26, 2010, 3:51 pm
On CS V2.0. Last reply: javier bolanos zeledon, Sep 30, 2010, 12:03 pm |
|
Permanent Metering of Sub-Systems- Option 1 / DSchools-2009 EAc5: Measurement and Verificationposted by Doug Pierce, AIA on Sep 27, 2010, 8:22 pm
We have a debate going in our office about whether Sub-Meters are required (or Not) for the Option D - Whole Systems Simulation method. In LEED NC V2.1, sub-meters were explicitly required, but... Last reply: Doug Pierce, AIA, Sep 30, 2010, 11:40 am |
|
Time Set Point Not Met Tolerance- Radiant Floor Heating SystemNC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Sep 29, 2010, 2:25 am
Time Set Point Not Met Tolerance is 0.2°C ( ... DOE had specified a tolerance of +-0.5F for this...energyplus has a default of 0.2 degC). Am I justified in relaxing this tolerance on a system... Last reply: Michael Tillou, Sep 30, 2010, 10:24 am |
|
LEED LCA Calculator Questions and ObservationsPilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Dirk Kestner on Sep 23, 2010, 6:47 pm
I just finished importing my data from the EC into the online LEED LCA Credit calculator and have a few questions and observations that might be helpful for others pursuing the credit. Q1... Last reply: Whit Faulconer, Sep 29, 2010, 12:43 pm |
|
100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATEREBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiencyposted by Yong Lee Low on Jul 27, 2010, 6:24 am
The project I am working on is using 100% of its water demand by collecting rain water in a man made lake in its boundary and then treating it in a water treatment facility,also in its site.Does... Last reply: Tristan Roberts, Sep 29, 2010, 12:32 pm |
|
dual flush calculationNC-2009 WEc2: Innovative Wastewater Technologiesposted by Jim Park on Sep 14, 2010, 9:41 pm
total daily uses # of... Last reply: Andrea Traber, Sep 29, 2010, 12:25 pm |
|
Previously developed site?CS-2009 SSc2: Development Density and Community Connectivityposted by Reid Highley on Sep 14, 2010, 2:53 pm
I am working on LEED documentation for a project that meets all the requirements in Option 2 for community connectivity. The site has never had a building on it, however it has been graded,... Last reply: Julie Hendricks, Sep 29, 2010, 12:09 pm |
|
FTE for hotel guestsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Tanmay Tathagat on Sep 20, 2010, 7:40 am
The concerned project building is a five star hotel. Table3 in WE p1 mentions the default fixture usage for... Last reply: Dan Ackerstein, Sep 29, 2010, 9:06 am |