Log in
Forum » Credit Forums
Topic

Pilot Credit 5 & 6

Pilot-Credits PC6: Integrative Project Planning & Design
posted by Jill DeMarotta on Aug 6, 2010, 4:02 pm

Has anyone finished with the Pilot Credit 5&6? Was your credit accepted?

Last reply: Jill DeMarotta, Sep 30, 2010, 3:32 pm

Common area toilets

CI-2009 WEp1: Water Use Reduction
posted by William Stangeland on Oct 14, 2009, 1:09 pm

Requiring tenants to include...

Last reply: Karen Blust, Sep 30, 2010, 12:32 pm

Local zoning requirements

CS-2009 SSc5.2: Site development - maximize open space
posted by javier bolanos zeledon on Sep 26, 2010, 3:51 pm

On CS V2.0.
According to my Country's local zoning requirements, you should build a maximum of 70% of the total land, but if you have pervious paving you can count that as open space. So...

Last reply: javier bolanos zeledon, Sep 30, 2010, 12:03 pm

Permanent Metering of Sub-Systems- Option 1 / D

Schools-2009 EAc5: Measurement and Verification
posted by Doug Pierce, AIA on Sep 27, 2010, 8:22 pm

We have a debate going in our office about whether Sub-Meters are required (or Not) for the Option D - Whole Systems Simulation method. In LEED NC V2.1, sub-meters were explicitly required, but...

Last reply: Doug Pierce, AIA, Sep 30, 2010, 11:40 am

Time Set Point Not Met Tolerance- Radiant Floor Heating System

NC-2009 EAp2: Minimum Energy Performance
posted by Jean Marais on Sep 29, 2010, 2:25 am

Time Set Point Not Met Tolerance is 0.2°C ( ... DOE had specified a tolerance of +-0.5F for this...energyplus has a default of 0.2 degC). Am I justified in relaxing this tolerance on a system...

Last reply: Michael Tillou, Sep 30, 2010, 10:24 am

LEED LCA Calculator Questions and Observations

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials 
posted by Dirk Kestner on Sep 23, 2010, 6:47 pm

I just finished importing my data from the EC into the online LEED LCA Credit calculator and have a few questions and observations that might be helpful for others pursuing the credit.

Q1...

Last reply: Whit Faulconer, Sep 29, 2010, 12:43 pm

100% WATER CONSUMPTION FROM TREATED HARVESTED RAIN WATER

EBOM-2009 WEc2: Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by Yong Lee Low on Jul 27, 2010, 6:24 am

The project I am working on is using 100% of its water demand by collecting rain water in a man made lake in its boundary and then treating it in a water treatment facility,also in its site.Does...

Last reply: Tristan Roberts, Sep 29, 2010, 12:32 pm

dual flush calculation

NC-2009 WEc2: Innovative Wastewater Technologies
posted by Jim Park on Sep 14, 2010, 9:41 pm

total daily uses # of...

Last reply: Andrea Traber, Sep 29, 2010, 12:25 pm

Previously developed site?

CS-2009 SSc2: Development Density and Community Connectivity
posted by Reid Highley on Sep 14, 2010, 2:53 pm

I am working on LEED documentation for a project that meets all the requirements in Option 2 for community connectivity. The site has never had a building on it, however it has been graded,...

Last reply: Julie Hendricks, Sep 29, 2010, 12:09 pm

FTE for hotel guests

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Tanmay Tathagat on Sep 20, 2010, 7:40 am

The concerned project building is a five star hotel. Table3 in WE p1 mentions the default fixture usage for...

Last reply: Dan Ackerstein, Sep 29, 2010, 9:06 am