Forum quick links
Transients Again
NC-2009 PIf3:Occupant and Usage Dataposted by Christopher Shaw on
I see many questions and answers on FTE's and visitors/transient, but none that quite makes it clear to me. So first, is the mail carrier who comes in once a day for oh 30 sec.
Screw chillers
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Mehdi Kardehi on
Hi , There is no mention of screw chillers either under the credit EA 4 or ASHRAE application. I can only see absorption, scroll and reciprocating. Can someone please help me with the life span to
Lighting Controls Exemption
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Katherine Roth on
Our project received the following review comment: "If any building spaces do not have automatic lighting control, provide information on the use and square footage of these spaces.
LEED CS building with very minimum landlord provision
CS-2009 EAp2:Minimum Energy Performanceposted by Michael Wahjudi on
Hi all, I have LEED CS with very minimum client provision without AC systems (only emergency lights, emergency fans and lifts).
Doing monthly photo report of IAQ management
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Indochine Engineering VN on
Hi, My project is under construction, but just structural work (finalizing substructure and launching superstructure). It is long way to furnishing and MEP work onsite.
Office building - Standard 62.1-2013 - Which toilet type?
CS-v4 EQp1:Minimum indoor air quality performanceposted by CHRISTOPHE MATHIEU on
Dear Leed user team, This question concerns the exhaust rate for toilets of an new office building.
Noise problems?
Healthcare-v2009 SSc9.1:Connection to the natural world - places of respiteposted by Garrett Ferguson on
We recently received comments back on this credit, stating that although we had provided the area required, "it does not appear that the areas indicated to be places of respite meet the definition
level of lighting consistent with building corridor
Pilot-Credits EQpc78:Design for active occupantsposted by Michelle Oishi on
For this option to be fulfilled can natural lighting be factored in, or is it limited to light fixtures?
Detailed LEED certification process
posted by T J on
Hi All, For people, who have had no experience working on an actual Leed project from start to finish, is there a detailed flow chart,tutorial, a presentation perhaps that lists detailed instructio
Anchor Bolt Recycle Content
NC-2009 MRc4:Recycled Contentposted by Sarfaraj Khan on
Hi I have a anchor bolt material and the supplier is saying that the steel is the world most recycle material.