Forum quick links
Exam room compliance
Healthcare-v2009 IEQc6.1:Controllability of systems - lightingposted by Todd Bundren on
what are the requirements for IEQc6.1 as it relates to exam rooms in an outpatient cancer center?
PERCENTAGE OF MALE USING URINAL
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by JAMES MARK CHAN on
is there any guidance about percentage of male expected to use urinal.
Pre-Rinse Spray Valve Before 11/1/2011 addenda
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Crina Bosch on
Above states "If your project is registered after the 11/1/2011 addenda release then the pre-rinse spray valve flow rate must be 1.6 gpm or less in order to comply with the prerequisite.
Default Fixture use for a School Project (shower)
Schools-2009 WEp1:Water Use Reduction—20% Reductionposted by Markus Henning on
I am working on a school project and actualy calculating WEp1. I am wondering that the default fixture use for a school indicate no daly uses for a shower for students.
Below Grade levels - excluded?
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Maya Karkour on
Hello, I have a question regarding below grade levels which have regularly occupied spaces If we refer to the excel sheet "HC Supplemental Daylight and Views Calculation Spreadsheet", it is specifi
Single Building Certification_LEED New Construction 2009
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Aswin M on
We have a Garment factory project that has three blocks with connectivity bridge. The three blocks are namely Cutting block, Sewing block, and Fabric store block.
Thinset Epoxy Terrazzo poured floor.
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Nelina Loiselle on
We have project using an epoxy terrazzo poured floor where the VOC's for both components are 0 g/L. I understand that these would be listed in IEQc4.2 under floor coatings.
4 point mandatory minimum
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Recently an addenda was published to refer that "for projects that register after XX/XX/XX and are subject to the four point mandatory minimum, demonstrate an 18% improvement in the proposed buildi
The amount of REC's necessary if onsite solar credits are sold
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Edmée Knight on
My buildings roof is covered in solar panels that generate at least 20% of the building's annual energy.
Design Phase Submittals
posted by Shannon Deeb on
At what point are design submittals made?