Forum quick links
Option on Survey of Fuel-efficient Carpool /Vanpool?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Michelle Bracewell-Musson on
Hello, I have used a survey that was accepted by GBCI based on the Leeduser Template, however, I feel like it would streamline the process if I gave two additional options in the How You Travelled
CrowdComfort - Credit IEQc7.2
CI-2009 IEQc7.2:Thermal Comfort—Verificationposted by Scott Balboni on
Hi All, I work for a tech start-up called CrowdComfort and we're looking to potentially partner with the Massachusetts USGBC.
EUROPE: Pre-rinse spray valve 1.6gpm or lower
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Charline SEYTIER on
Our project is an office bldg with a Kitchen Restaurant in Europe. We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower available in France/Switzerland/Germany...
CSR- GRI Report
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by LEED Pro Consultant on
I have a question regarding option 1. The GRI report for a product does not address the raw material supplier extraction location.
Water Consumption Outside LEED Boundary
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Aswin M on
We have a garment factory project that has a Main block and two toilet blocks (separately for Men & Women).
Eyeball Audits as Backup for Commingled Diversion
Homes-v2008 MRc3:Waste managementposted by Michelle Rosenberger on
Hi Ann, This is a repost from NC, MRc2. I am hoping that you can shed some light on this. Our Seattle region has a very developed state regulated construction waste diversion infrastructure.
VOC limits?
Retail-CI-v2009 IEQc4.6:Low-emitting materials - ceiling and wall systemsposted by Erica Downs on
I am new to IDC Retail... hopefully others have some experiece? i have the IDC Retail Supplement, and it really does not say anything at all other than the language provided above.
Expected Waste Volume
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Saud Abdul Rasheed on
Hi all, Our project is a commercial tower mainly with offices and few retail shops. The total area is 272,500 sq. ft. and we have provided waste collection area of 620 sq. ft. in the basement.
Invoice Requirements
CS-2009 MRc6:Certified Woodposted by Charles Nepps on
Per the the FAQ's above: "GBCI had required invoices for all wood products, but has switched to requiring only invoices for FSC certified products, per the April 2008 FSC memo, which states that al
Where is the line again?
NC-2009 MRc7:Certified Woodposted by Daniel Hartsig on
There are specific inclusions for bamboo and cork (neither are wood) in MRc7, but it is still unclear where to draw the line between solid, wood chip and wood fiber products that still look like wo