Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Baseline systems

CS-2009 EAp2:Minimum Energy Performance
posted by  Samuel Sura  on 

Hi LeedUsers, I have one simple question. According to section G3.1.1 of ASHRAE 90.1 Standard each floor for system 5 through 8 shall be modeled with a separate HVAC system.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 13, 2016, 1:34 pm

Elevation with more than 40% glazing

NC-2009 EAp2:Minimum Energy Performance
posted by  Charalampos Giannikopoulos  on 

For a building with an elevation with 70% glazing and the others with less than 40%, how would the baseline elevations be modelled?

4
Wed Jan 13, 2016, 9:17 am

Site Surrounding that Partially Developed

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Michael Wahjudi  on 

Our project is located at site that the surrounding site partially already developed and able to meet the development density requirement.

3
Wed Jan 13, 2016, 2:47 am

net area vs gross area (simulation) in IEQc8.1

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Panagiota Dadinou  on 

Hello, a question concerning IEQc8.1 & IEQc8.2 . Can we use the net floor area instead of gross floor area for the simulation in Matrix_Table IEQ-1 Daylight and views? I would like to use t

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Jan 12, 2016, 9:51 pm

What needs to be commissionined in a Major Renovation

CS-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Donald Green  on 

We have a LEED v2009 CS Project - existing building major renovation. Most of the systems will not be touched and there will be the addition of a couple new mechanical units.

3
Sr Project Manager / Operations Manager
Progressive AE
LEEDuser Basic Member
25 thumbs up
Mon Jan 11, 2016, 4:37 pm

100% OA VAV Base Building system

CI-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Christie Rimes  on 

Hi, the CI project I am working on uses only the base building system supply for meeting rooms with between 2 and 8 people.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Sun Jan 10, 2016, 10:08 pm

Nearby Non-residential Building Under Construction

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Charline SEYTIER  on 

Hi All, Currently working on a project with a nearby building under construction. We anticipate the building construction to finish slightly after our project.

3
CEO, Co-owner.
ThemaVerde, France
LEEDuser Basic Member
15 thumbs up
Fri Jan 8, 2016, 11:36 pm

EER to COP conversion

CI-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

Hi, I am trying to document the efficiency for comms room AC units and a data centre down flow AC units. As we are in Europe the efficiency is quoted by manufacturers in EER.

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Fri Jan 8, 2016, 8:32 pm

Use of Table fans in Working Desk

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  SAMY Chamy  on 

Dear all Our production area is sewing machines so we install table fan with switches in every sewing table.

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Fri Jan 8, 2016, 6:15 pm

NC to HC Guidance Document

LEED for Healthcare forum
posted by  Tamary Alvarez  on 

Hello, I have been trying to find the guidance document that addresses the rating system switch requirements (from NC to HC) but haven't had luck. Could someone please post the link?

4
Principal
Ross G. Spiegel Architect
LEEDuser Basic Member
9 thumbs up
Fri Jan 8, 2016, 4:34 pm