Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Need Registration guidance for an upcoming Hospital campus

LEED Guidance for Campuses and Multiple Buildings
posted by  Neha Singhal  on 

We have a Medical institution coming up at Faridabad (India), which contains various types of building, where the construction would be carried out simultaneously for all the blocks.

3
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Sun Jan 17, 2016, 4:51 pm

Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Ali Scander  on 

Hello everyone, I just started working on a LEED 2009 project. I need some advice. The project has already had its design preliminary review and It is now in the design final application.

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Sat Jan 16, 2016, 8:34 am

No Parking Provided - Option 4 Vehicle Sharing

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Pamela Mendez  on 

Our project is a Residential Building with No Parking provided. A LE/FE Vehicle Contract will be implemented for (2) Years.

3
Thu Jan 14, 2016, 11:27 pm

No LEED ND v4 RP credits on LEED website?

ND-v4 RPc1:Regional priority
posted by  Nate Tsang  on 

There are no LEED v4 ND RP credits on the regional priority credit lookup on the USGBC website. Can these projects receive RP credits?

4
Thu Jan 14, 2016, 7:50 pm

LEED-Healthcare: EAc5 M&V Exemplary Performance

Healthcare-v2009 EAc5:Measurement and verification
posted by  Megan Shelby  on 

For EAc5 M&V: The Addenda allows NC, CS and Schools projects to earn an exemplary performance point for pursuing Option 3 (meeting MPR6 through the Energy and Water Data Release Form) in additi

6
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Thu Jan 14, 2016, 5:16 pm

rooftop parking lots

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Noriko Nagazumi  on 

Hi, Our project building is retail facility and has 4 above grade floors. The entire facility is conditioned. There is a parking floor above the retail floors.

6
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Thu Jan 14, 2016, 3:24 am

Furniture - scope of work for EQ credit impacts MR credits?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Charline SEYTIER  on 

Dear All, If we use the strategy F for the EQ credit Interior Lighting, furniture is ‘officially’ in LEED scope. Does it mean that we have to include furniture in MR BPDO credits?

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Jan 13, 2016, 9:39 pm

CDPH/EHLB/Standard Method Version 1.1 vs. CA 01350 2004

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Sara Zoumbaris  on 

Is it now acceptable for LEED v2009 projects to use the Version 1.1 test for products as an alternative to the CA01350 2004 version? This is for a CI project pursuing this credit for ID. Thanks!

2
Products and materials specialist
BuildingGreen
LEEDuser Expert
21 thumbs up
Wed Jan 13, 2016, 4:24 pm

School LEED EBOM

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Esteban Martinez  on 

Hi, There are any special considerations for a project like a school? The documentation process it is the same for the diferents types of buildings in EBOM v2009? Thanks for your answers,

3
Wed Jan 13, 2016, 4:09 pm

Paint in Parking Lot

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Maggie Hogan Skaug  on 

This is a follow up to a thread in 2012 regarding paint used to stripe parking stalls (enclosed parking structure).

5
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Jan 13, 2016, 3:56 pm