Forum quick links
No LEED ND v4 RP credits on LEED website?
ND-v4 RPc1:Regional priorityposted by Nate Tsang on
There are no LEED v4 ND RP credits on the regional priority credit lookup on the USGBC website. Can these projects receive RP credits?
LEED-Healthcare: EAc5 M&V Exemplary Performance
Healthcare-v2009 EAc5:Measurement and verificationposted by Megan Shelby on
For EAc5 M&V: The Addenda allows NC, CS and Schools projects to earn an exemplary performance point for pursuing Option 3 (meeting MPR6 through the Energy and Water Data Release Form) in additi
rooftop parking lots
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Noriko Nagazumi on
Hi, Our project building is retail facility and has 4 above grade floors. The entire facility is conditioned. There is a parking floor above the retail floors.
Furniture - scope of work for EQ credit impacts MR credits?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Charline SEYTIER on
Dear All, If we use the strategy F for the EQ credit Interior Lighting, furniture is ‘officially’ in LEED scope. Does it mean that we have to include furniture in MR BPDO credits?
CDPH/EHLB/Standard Method Version 1.1 vs. CA 01350 2004
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Sara Zoumbaris on
Is it now acceptable for LEED v2009 projects to use the Version 1.1 test for products as an alternative to the CA01350 2004 version? This is for a CI project pursuing this credit for ID. Thanks!
School LEED EBOM
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Esteban Martinez on
Hi, There are any special considerations for a project like a school? The documentation process it is the same for the diferents types of buildings in EBOM v2009? Thanks for your answers,
Paint in Parking Lot
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Maggie Hogan Skaug on
This is a follow up to a thread in 2012 regarding paint used to stripe parking stalls (enclosed parking structure).
Baseline systems
CS-2009 EAp2:Minimum Energy Performanceposted by Samuel Sura on
Hi LeedUsers, I have one simple question. According to section G3.1.1 of ASHRAE 90.1 Standard each floor for system 5 through 8 shall be modeled with a separate HVAC system.
Elevation with more than 40% glazing
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For a building with an elevation with 70% glazing and the others with less than 40%, how would the baseline elevations be modelled?
Site Surrounding that Partially Developed
NC-2009 SSc2:Development Density and Community Connectivityposted by Michael Wahjudi on
Our project is located at site that the surrounding site partially already developed and able to meet the development density requirement.