Planting recycled conent

NC-2009 MRc4:Recycled Content
posted by  Thomas Perkins  on 

“Site materials (31.60.00 Foundations, 32.10.00 Paving, 32.30.00 Site Improvements, and 32.90.00 Planting) that are permanently installed can be included in the MR credits.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Wed Jan 27, 2016, 12:04 am

Size of map

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Dave L  on 

I have a project in which I need to “provide a revised map that highlights the existing residential area and density.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Tue Jan 26, 2016, 7:52 pm

Spring and Fall Conditions on the Thermal Comfort Tool

CI-2009 IEQc7.1:Thermal Comfort—Design
posted by  Logan Dorrell  on 

What are we supposed to submit for the "Spring" and "Fall" conditions for the Thermal Comfort Tool for Upload IEQc7.1-2? We have design setpoints for cooling and heating and easily identifiable cl

2
Tue Jan 26, 2016, 6:52 pm

Idle energy rate for energy star equivalency calculations

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Shuchita Gupta  on 

Hi , We have an interior project specifying kitchen appliances like electric fryer , which are not energy star labelled so we are checking the equivalency for which we require idle rate and cook

2
Tue Jan 26, 2016, 1:09 pm

Documenting Donation or Resale of Salvaged Material

NC-2009 MRc2:Construction Waste Management
posted by  Jennifer Preston  on 

Our project involves demolition. There are some materials - wood beams, bricks - that will likely be either donated to a reuse center or sold.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Jan 25, 2016, 7:34 pm

ASHRAE 55 Compliance

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  David Mirabile  on 

My project is a Housing Authority remodel that has to meet Energy Star, thus be ASHRAE 55 compliant.

2
Mon Jan 25, 2016, 5:17 pm

Method to Achieve Thermal - Comfort for Ventilated Area

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  SAMY Chamy  on 

Hai Everyone:- Our project is sewing factory It is not fully conditioned (A/C & Ventilation) 1.A/c for Office area 2.Fans (Exhaust, Fresh air, HVLS fans) for Production area We use HVLS fan

3
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Mon Jan 25, 2016, 3:44 pm

Materials in Major Renovation Projects

NC-2009 MRc2:Construction Waste Management
posted by  JP Rout  on 

We have Project intending to be registered under LEED 2009 BD+C for major renovations.

3
Default Avatar
LEEDuser Basic Member
5 thumbs up
Mon Jan 25, 2016, 3:24 pm

Compressor replacement + R422D refrigerant

EBOM-2009 EAc5:Enhanced Refrigerant Management
posted by  Norbert Szircsak  on 

Dear All, I have two issues where I don't really know what would be the proper solution. 1. After about 10 years one of the compressors in a chiller went wrong and has been replaced.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Mon Jan 25, 2016, 10:43 am

Construction Activity and Pollution Prevention

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  JP Rout  on 

We have Project intending to be registered under LEED 2009 BD+C for major renovations.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 25, 2016, 9:13 am