Topic | Recent |
---|---|
Base Building FixturesCI-2009 WEp1: Water Use Reductionposted by Norma Lehman on Jun 9, 2011, 2:14 pm
just to confirm, because I feel like there is conflicting (and a lot of) information being posted...the tenant is fitting out a suite in an... Last reply: Elizabeth Powers, Feb 9, 2012, 6:02 pm |
|
1 FTENC-2009 SSc4.4: Alternative transportation - parking capacityposted by on Feb 7, 2012, 4:34 pm
Is it possible to achieve this credit if there is only 1... Last reply: Tristan Roberts, Feb 9, 2012, 3:15 pm |
|
IEQp1 required signatoryNC-2009 IEQp1: Minimum indoor air quality performanceposted by Anne-Maria Vierinen on Feb 8, 2012, 5:41 am
Our HVAC designer is also the ventilation systems designer on our project. Does anyone know if each project team member is required to have only a single role, or can they somehow be given dual... Last reply: David Posada, Feb 9, 2012, 5:53 am |
|
LEED CIGeneral forumsposted by MARIA GARCIA on Feb 8, 2012, 11:12 am
Dear all, Last reply: MARIA GARCIA, Feb 9, 2012, 4:39 am |
|
Using the centerline as the "site boundary"NC-2009 SSc8: Light Pollution Reductionposted by Zachary Guren on Feb 8, 2012, 5:23 pm
The requirements state that for all zones: "Illuminance generated from a single luminaire placed at the intersection of a private vehicular driveway and public roadway accessing the site is... |
|
Regularly Occupied Space in Core & Shell for office buildingsGeneral forumsposted by eileen hughes on Feb 7, 2012, 1:28 pm
Are bathrooms, stairwells, and corridors considered a regularly occupied space for a LEED Core & Shell office building? Last reply: David Posada, Feb 8, 2012, 4:43 pm |
|
PEAK Transients--What makes for PEAK? Not TOTALLY Occupied?NC-2009 SSc4.2: Alternative transportation - bicycle storage and changing roomsposted by Brooks Critchfield on Feb 8, 2012, 12:33 pm
When calculating the PEAK transients, do we need to plan for every... Last reply: David Posada, Feb 8, 2012, 4:31 pm |
|
Charging stations and CalgreenNC-2009 SSc4.3: Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Deborah Lucking on Feb 8, 2012, 2:36 pm
Our project in California is pursuing SSc4.3 by providing charging stations. But Calgreen (the California green building code) does not have provisions for charging stations, only the requirement... |
|
Option 2 with exterior lights on motion sensorsEBOM-2009 SSc8: Light Pollution Reductionposted by Melinda Shah on Feb 8, 2012, 11:59 am
The only exterior lights on the building we are working on are historic light fixtures at the entrances to the garage. Although the fixtures are 175 watts and are not partially or fully shielded... |
|
EQp1LEED for Healthcare forumposted by James Chueh on Feb 8, 2012, 4:39 am
I have a small question regarding ASHRAE standard 170-2008. On page 5, Table 6-1 which specifies what type of filter to be used within a health care facility, according to the different... Last reply: james moler, p.e., Feb 8, 2012, 9:38 am |