Project GFA excluding underground parking areas?

CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Andreas M. Roessler  on 

During the registration process of the project and in the Project Information Form “PI f 2 – Project Summary Details” we were/are asked to indicate the total project gross floor area with an exclus

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 4, 2016, 3:52 pm

How to apply the enhanced commissioning task to existing?

NC-2009 EAc3:Enhanced Commissioning
posted by  Dave Hubka  on 

Hi Scott, We are involved with a major addition to an existing building. We will be certifying the entire building.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Sat Apr 2, 2016, 2:22 pm

n/a

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Anastasia Makarenko  on 

Dear all, we have the following situation with one of our projects. The project we are certifying is a laboratory building that is a part of the big existing factory site.

5
Fri Apr 1, 2016, 3:03 pm

District Energy System owned by Government vs. Owner

NC-2009 EAc3:Enhanced Commissioning
posted by  Erin Holdenried  on 

My question is in regard to both EAc3: Enhanced Commissioning and EAc5: Measurement and Verification credits in relation to a District Energy System.

3
Fri Apr 1, 2016, 6:31 am

single zone or multi-zone calculation?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Hongyun Zhou  on 

I have a project, which have two types of system: 1. OA system offering the fresh air to each room, and each room has an individual fan coil unit . 2.

2
Fri Apr 1, 2016, 1:41 am

Design for Active Participants

Pilot-Credits EQpc78:Design for active occupants
posted by  Robert Fiala  on 

We found this pilot credit after our school project was designed and beginning construction.

2
Thu Mar 31, 2016, 5:01 pm

LEED EBOM EAP2 Minimum Energy Effiuciency

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  ABDUL MUTHALIB MOHAMED  on 

Hi, We are pursuing Option 2B: Energy Baseline including Historical Data for minimum energy efficiency, the weather normalized Energy Use Index from Energy Star Portfolio Manager during performance

3
Thu Mar 31, 2016, 4:15 pm

HPD - predicted by process chemistry

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Suzanne Drake  on 

"Predicted by process chemistry" is indicated on the HPD I am reviewing. Is this acceptable in any way toward the Building Product Disclosure credit?

3
sustainability director
Revel
LEEDuser Basic Member
0 thumbs up
Thu Mar 31, 2016, 3:45 pm

MOB - Recycling Calculations

Healthcare-v2009 MRp1:Storage and collection of recyclables
posted by  Lauren Bellamy  on 

I am working on this credit for a new MOB. I have looked online without any success on a baseline for the projected volume of recyclables.

5
Sustainability Leader and Architect
AECOM
LEEDuser Premium Member
9 thumbs up
Thu Mar 31, 2016, 12:51 pm

Option 1 - HPD Residual Disclosure

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Dalton Ho  on 

Option 1 requirements state that for the HPD to be applicable, the “HPD standards for the 1,000-ppm level must be attained and the appropriate box on the summary page checked”.

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Mar 30, 2016, 7:55 pm