Project GFA excluding underground parking areas?
CS-2009 MRc1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Andreas M. Roessler on
During the registration process of the project and in the Project Information Form “PI f 2 – Project Summary Details” we were/are asked to indicate the total project gross floor area with an exclus
How to apply the enhanced commissioning task to existing?
NC-2009 EAc3:Enhanced Commissioningposted by Dave Hubka on
Hi Scott, We are involved with a major addition to an existing building. We will be certifying the entire building.
n/a
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Anastasia Makarenko on
Dear all, we have the following situation with one of our projects. The project we are certifying is a laboratory building that is a part of the big existing factory site.
District Energy System owned by Government vs. Owner
NC-2009 EAc3:Enhanced Commissioningposted by Erin Holdenried on
My question is in regard to both EAc3: Enhanced Commissioning and EAc5: Measurement and Verification credits in relation to a District Energy System.
single zone or multi-zone calculation?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Hongyun Zhou on
I have a project, which have two types of system: 1. OA system offering the fresh air to each room, and each room has an individual fan coil unit . 2.
Design for Active Participants
Pilot-Credits EQpc78:Design for active occupantsposted by Robert Fiala on
We found this pilot credit after our school project was designed and beginning construction.
LEED EBOM EAP2 Minimum Energy Effiuciency
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by ABDUL MUTHALIB MOHAMED on
Hi, We are pursuing Option 2B: Energy Baseline including Historical Data for minimum energy efficiency, the weather normalized Energy Use Index from Energy Star Portfolio Manager during performance
HPD - predicted by process chemistry
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Suzanne Drake on
"Predicted by process chemistry" is indicated on the HPD I am reviewing. Is this acceptable in any way toward the Building Product Disclosure credit?
MOB - Recycling Calculations
Healthcare-v2009 MRp1:Storage and collection of recyclablesposted by Lauren Bellamy on
I am working on this credit for a new MOB. I have looked online without any success on a baseline for the projected volume of recyclables.
Option 1 - HPD Residual Disclosure
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Dalton Ho on
Option 1 requirements state that for the HPD to be applicable, the “HPD standards for the 1,000-ppm level must be attained and the appropriate box on the summary page checked”.