We found this pilot credit after our school project was designed and beginning construction. We were able to meet the pilot credit options because most of the requirements were standard design features which we incorporate into our typical school projects already. There is synergy with credits SSc4.2 and SSc10 as well.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Gary Dunn
January 29, 2016 - 6:28 pm
We did the same and learned that another school in the district was already pursuing this same credit. We had designed the project as an open concept with plenty of centrally located stairs to serve as the primary means of travel between floors. Just became a matter of defining a program for the faculty to be able to use the gym and athletic equipment available in the school. Will provide a template for other schools in the district to follow for their own programs.
Angela Wisely
1 thumbs up
March 31, 2016 - 1:01 pm
Our school project was in the same situation. All credit requirements were in place prior to learning about the credit.