air-cooled chiller condenser fans modeled separately?
NC-2009 EAp2:Minimum Energy Performanceposted by Rob Pinkston on
Hello, Is it mandatory to break-out/model the condenser fans for an air-cooled chiller separately?
Case 1 vs Case 2
CI-2009 EAc3:Measurement and Verificationposted by Brightworks Sustainability on
Our TI project is 4 floors of a large building, so
EAp2 Proposed Design
CS-2009 EAp2:Minimum Energy Performanceposted by James Wieben on
I have a CS project in Seattle and would like to use the local energy code as the basis of design for areas outside of the Owner's scope of work.
basic soil tests at design phase
NC-v4 SSc2:Site development - protect or restore habitatposted by Charline SEYTIER on
Dear All, We are pursuing option 1 in one of our projects and want to submit it for Design Submission as this is a Design Credit. However Documentation requires "basic soils test(s) to demonstrate
Hotel development - Multiple Buildings
posted by Charalampos Giannikopoulos on
Would a project including the development of a luxurious resort hotel be eligible for certification under v4 NC?
Construction Waste Management-Multiple Buildings
NC-2009 MRc2:Construction Waste Managementposted by Ian McCall on
Dear LEED-ers, Scenario : One single project, consisting of an office building (LEED Ceritified) & hotel building (NOT LEED Certified) in a very built up area with limited space.
How to earn AP with specialty?
Healthcare-v4 INc2:LEED Accredited Professionalposted by Joyce Kelly on
How does one earn LEED AP with specialty? I would like to earn the right to be LEED AP on Healthcare projects in the future. Is there a specialty exam to take? I am just BD+C.
EAP2 required HAP input summary
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Wright on
For the EAP2 upload EAP2-14 LEED is asking for the modeling software "input summary." What specific input summaries are required for Carrier HAP? I am modeling a building over 100,000 sq ft.
IEQ Credit 5 - Supply Air Recirculation
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Raj G on
In our project, we have a janitor room adjacent to a toilet and these both rooms have exhaust duct which are combined together & exhausted directly to outside without re circulation. But, we h