ETo Unit
NC-2009 WEc1:Water Efficient Landscapingposted by GISELA FARHAT DE ARAUJO on
I would like to know which unit of measurement should include the value of ETO (Reference evapotranspiration rate). Im Brazil we normaly use mm. should i put in Inches?
Central PV system distribution to one LEED target building
NC-2009 EAc2:On-Site Renewable Energyposted by Hongyun Zhou on
I am working on a single building LEED project in an industry park, which has a central PV system inside.
precerticfiation
posted by Tristan Roberts on
Do you have a copy of the BD&C Reference Guide? CS Appendix 5 discusses precertification.
Floor area - allowable difference between sim. model and PIf3
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Anna Korinkova on
We are pursuing the Option 1 - simulation path. The total regularly occupied area (ROA) reported for the simulation is linked to the PIf3 credit.
Waste Stream Audit
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Trevor Anderson on
Under LEED v4, is the waste audit requirement the same for projects achieving initial certification and recertification, or do recertifying projects need to conduct one waste audit for each year of
Sea water exchanger heat pump, considere as renewable energy ?
NC-2009 EAc2:On-Site Renewable Energyposted by Elodie DUMAS on
Hello We work on an office building connected to DES heating and colling (district level) and pursue Leed C&S v2009 certification.
Purpose behind the 60% RH parameter?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Landry Watson on
The reference guide is clear that 14,000 CFM of OA per SF (that is >60deg and
Path 2 Flushout
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Amy Harmon on
Our project went with Path 2 Post-occupancy flush out. All AHUs required 2-4 days of flush out before occupancy could occur and about 24 days post occupancy.
n/a
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Anastasia Makarenko on
Dear all, does anybody know if we should consider microbiology laboratory premises as a pollutant source for this credit?
Data Center Modeling - LEED CS version 2009
CS-2009 EAp2:Minimum Energy Performanceposted by Anurag Joshi on
Dear fellow modelers, I have a query regarding modeling and saving percentage calculation for datacenter buildings for LEED CS -2009.