Shuttle Services

NC-v4 LTc5:Access to quality transit
posted by  sriram tetali  on 

Dear All can any one suggest whether we can claim the Shuttle services provided by client in the LTc4 or LTc5 credits in LEED v4 NC Rating system Thanks & Regards sriram

2
Fri Mar 17, 2017, 11:26 am

Synthetic grass surfacing

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  David Browne  on 

I have an indoor football practice facility under review. The facility consists of a covered football field and a "head house" containing toilets, training rooms, etc.).

4
Default Avatar
Architect
CRA Associates, Inc.
LEEDuser Premium Member
5 thumbs up
Thu Mar 16, 2017, 1:50 pm

Major renovation of historic landmark building

NC-2009 EAp2:Minimum Energy Performance
posted by  Veronica Reed  on 

Hello I am working on the major renovation of a historic landmark building in part of an area protected as world heritage site by UNESCO, and the building cannot be modified in its envelope since

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Mar 16, 2017, 5:06 am

CO2 Sensors

EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoring
posted by  AshLee Eustace  on 

I'm trying to get an idea of where CO2 sensors would be required on a project. It is an office building with one AHU per floor and one for a fitness center.

6
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Wed Mar 15, 2017, 6:01 pm

Modeling Office Space in an Existing High Rise Building

CI-v4 EAp2:Minimum energy performance
posted by  Annie Argento   on 

We're using eQuest to model a tenant improvement office space, which is about half of one story in a 28 story high rise office building in LA.

2
Wed Mar 15, 2017, 2:06 pm

Dedicated bike lanes

Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Phillip Henning  on 

What is a dedicated bike lane? I have a sidewalk leading to a new elementary school in two different directions. One is approximately 100 feet long from the from the primary access road.

3
Tue Mar 14, 2017, 11:15 pm

overall accuracy, anticipated areas of error susceptibility

NC-2009 EAc5:Measurement and Verification
posted by  Leanne Niu  on 

There is a review comment in my project as follows: It appears that the M&V plan provided does not specify the expected overall accuracy, anticipated areas of error susceptibility, and magnitud

3
Default Avatar
AECOM
LEEDuser Basic Member
0 thumbs up
Tue Mar 14, 2017, 6:28 pm

New materials and resources calculator since 12/01/16

NC-2009 MRc5:Regional Materials
posted by  Guillermo Brunzini  on 

Hello Everybody, Two questions: 1- a project registered in 2012 can use the new materials and resources calculator? 2- What happens with the cutsheets required in previous versions,?

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Tue Mar 14, 2017, 3:55 pm
4
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Mon Mar 13, 2017, 10:01 pm

Local voluntary cleanup program - definition

NC-2009 SSc3:Brownfield Redevelopment
posted by  Anna Korinkova  on 

Under Option 1 of the credit, we can pursue EITHER the ASTM E1903-97 Phase II Environmental Site Assessment OR the 'local voluntary cleanup program'.

3
Mon Mar 13, 2017, 4:52 pm