Hello I am working on the major renovation of a historic landmark building in part of an area protected as world heritage site by UNESCO, and the building cannot be modified in its envelope since the structure is a load bearing wall building dating back to the 1890's. For energy performance doing the energy modeling, is there an exception for having to compare against a baseline with envelope materials as described in 90.1 as these would be impossible conditions since the envelope cannot be modified
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.