Forum quick links
Lavatories in special conditions
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vanessa Montezuma Ramos on
Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.
CBECS energy use intensity
Retail-CI-v2009 EAc5:On-site renewable energyposted by Ricardo Sá on
What is the adequate indicator for estimating the energy use intensity for a supermarket (100% electricity) using the CBECS?
WEc2: Time frame for functional reclaimed water systems
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Brian Bartholomew on
Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys
Pursuing credits in recert that were denied during intial cert
posted by Alexa Stone on
Hi LEED Experts, My question pertains specifically to two credits in the LEED v2009 EBOM rating system, SSc3 & EQ3.6. These two credits were denied during the original certification.
How much of the area inside the LEED boundary must be included?
NC-2009 WEc1:Water Efficient Landscapingposted by Lawrence Lile on
We have a project where a good part of the non-hardscaped area inside the LEED boundary will be planted in native prairie grasses, with no irrigation.
Regulated vs. Unregulated??
NC-v4 EAc2:Optimize energy performanceposted by Edgar Arevalo on
I'm filling out the information from the energy model to the LEED v4 Minimum Performance Calculator and i noticed a check mark next to each end-use when filling out energy consumption and power dem
Wrong Diversion Method
NC-2009 MRc2:Construction Waste Managementposted by Chris Anderson on
I have a problem, our construction waste management plan didn't specify Load-specific diversion reports, so all of the reports we have received (5 months) have been facility average rates.
Points awarded for reduced conditioned space
NC-v4 EAc2:Optimize energy performanceposted by Amrit Kaur on
LEED V4 homes awards ( and generously) for residential projects with areas smaller than an accepted reference standard, and deducts points for residential units exceeding these standards.
Case 2 Option 2?
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Gail Napell on
our client has far less than 75% of the building. the building has parking, but it is not allocated to any tenant and not subsidized. Please confirm this achieves NO points?
Applicable Cooling source in Propose case - LEED Group - v4 C&S
CS-2009 EAp2:Minimum Energy Performanceposted by Ashraf Ali Khan Khan on
I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.