Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Lavatories in special conditions

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vanessa Montezuma Ramos  on 

Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.

1
Mon Jul 10, 2017, 6:27 pm

CBECS energy use intensity

Retail-CI-v2009 EAc5:On-site renewable energy
posted by  Ricardo Sá  on 

What is the adequate indicator for estimating the energy use intensity for a supermarket (100% electricity) using the CBECS?

1
Tue Jun 6, 2017, 6:54 pm

WEc2: Time frame for functional reclaimed water systems

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Brian Bartholomew  on 

Under the Bird's Eye View here for WEc2, there is a citation of LEED Interpretation #10012 made on 05/09/2011 which states "projects may only count future infrastructure such as reclaimed water sys

1
Sat Aug 26, 2017, 9:52 pm

Pursuing credits in recert that were denied during intial cert

Performance Period
posted by  Alexa Stone  on 

Hi LEED Experts, My question pertains specifically to two credits in the LEED v2009 EBOM rating system, SSc3 & EQ3.6. These two credits were denied during the original certification.

1
Mon Aug 28, 2017, 6:00 pm

How much of the area inside the LEED boundary must be included?

NC-2009 WEc1:Water Efficient Landscaping
posted by  Lawrence Lile  on 

We have a project where a good part of the non-hardscaped area inside the LEED boundary will be planted in native prairie grasses, with no irrigation.

1
Wed Jun 7, 2017, 10:02 pm

Regulated vs. Unregulated??

NC-v4 EAc2:Optimize energy performance
posted by  Edgar Arevalo  on 

I'm filling out the information from the energy model to the LEED v4 Minimum Performance Calculator and i noticed a check mark next to each end-use when filling out energy consumption and power dem

1
Wed Jun 7, 2017, 1:39 pm

Wrong Diversion Method

NC-2009 MRc2:Construction Waste Management
posted by  Chris Anderson  on 

I have a problem, our construction waste management plan didn't specify Load-specific diversion reports, so all of the reports we have received (5 months) have been facility average rates.

1
Wed Jun 7, 2017, 5:22 pm

Points awarded for reduced conditioned space

NC-v4 EAc2:Optimize energy performance
posted by  Amrit Kaur  on 

LEED V4 homes awards ( and generously) for residential projects with areas smaller than an accepted reference standard, and deducts points for residential units exceeding these standards.

1
Sat Aug 26, 2017, 12:59 pm

Case 2 Option 2?

CI-2009 SSc3.3:Alternative Transportation—Parking Availability
posted by  Gail Napell  on 

our client has far less than 75% of the building. the building has parking, but it is not allocated to any tenant and not subsidized. Please confirm this achieves NO points?

1
Sat Aug 26, 2017, 10:44 pm

Applicable Cooling source in Propose case - LEED Group - v4 C&S

CS-2009 EAp2:Minimum Energy Performance
posted by  Ashraf Ali Khan Khan  on 

I am modelling for LEED GROUP - v4 BD+C: CS. Project has 40 Office buildings shared with same basement and served with multiple Water Cooled Chillers as cooling source.

1
Fri Jun 9, 2017, 1:06 pm