System Type 9 Baseline Fan Sizing
NC-2009 EAp2:Minimum Energy Performanceposted by Brian Kenney on
I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.
Bus Line Rerouting for Adjacent Bridge Construction
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Kevin McNulty on
Hi. My firm is working on a building that will be located right at the foot of a large bridge project that is currently in construction (estimated reopening in a few years).
No Cooling Tower - Alternative Compliance Path
NC-v4 WEc3:Cooling tower water useposted by Kristina Pobre on
My project does not have a cooling tower.
Nee of a fire suppression system
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Magda Aghababyan on
Hi all, Currently we are working on a project which does not have a fire suppression system, but is trying to achieve "Enhanced refrigerant management" credit in LEED NC 2009. In the LEED online fo
DCV In Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
Hi all, Modelling DCV has been discussed many times in this forum. I gone through and understand quite a bit. I am listing my understanding along with some quires.
Operable windows -ground floor or upperfloor?
NC-v4 EQp2:Environmental tobacco smoke controlposted by Florian Schmidtchen on
Dear Sir or Madam, Smoking must be prohibited within 25 feet of building entries, outdoor air intakes, and operable windows.
Re-using existing building as outdoor amphitheater
NC-v4 MRc1:Building life-cycle impact reductionposted by Jeff Denno on
Hello, We are working on a New Construction project where they plan to keep 25% of the existing brick wall from the existing building in-tact for an outdoor amphitheater that is not attached to th
STC rating for the combination office - hallway
NC-v4 EQc9:Acoustic performanceposted by Florian Schmidtchen on
Dear all, I have a question according to meet the composite sound transmission class (STCC) ratings listed in Table 1: Do we have to meet the STC rating for the combination 'office - hallway' for a
Renewable sources area = calculation exception?
NC-v4 SSc3:Open spaceposted by Kristina Pobre on
Is the area for on-site renewable sources an exception to the calculation from the 30% site area?
Exemplary performance credit
CI-v4 LTc3:Access to quality transitposted by Richard Woodward on
Is an exemplary performance credit available for CI certifications? Double the highest service point threshold?