Forum quick links
Interior lighting for residential project
NC-2009 SSc8:Light Pollution Reductionposted by Deborah Spira on
Hi all, I am working on a residential multi-dwelling building. For a residential building it is impossible to control or decide the interior lighting for the apartments.
initial lumens
NC-2009 SSc8:Light Pollution Reductionposted by paul martin on
I have a dumb question - when they ask for Initial fixture lumens per lumenaire, do they want fixture output lumens or the lamp lumens? Big difference in the percentage calc.
Street Lights within LEED boundary
NC-2009 SSc8:Light Pollution Reductionposted by Deborah Lucking on
Our project is in an urban site; the LEED boundary goes beyond the property line and sometimes the curbline.
How to Document Straight Down Fixture Lumens
NC-2009 SSc8:Light Pollution Reductionposted by Omer Moltay on
We have to document that, for LZ2, max. 2% of initial fixture lumens are emitted at an angle of 90 degrees of more from nadir. In your experience how would you achieve this?
Wall on Site Boundary
NC-2009 SSc8:Light Pollution Reductionposted by Omer Moltay on
We have a 2 m. high brick wall running all around out site.
exterior uplights under canopy
NC-2009 SSc8:Light Pollution Reductionposted by gustavo goldman on
SSc8 includes a limitation in terms of the total initial designed fixture lumens emitted at an angle of 90 degrees or higher from nadir (for example, 2% for LZ2).
Interior Lighting with no IES file
NC-2009 SSc8:Light Pollution Reductionposted by Eamon Geary on
I have been working on a 1000-person lodge which is shooting for LEED Silver.
Compliant Exterior lighting and security cameras
NC-2009 SSc8:Light Pollution Reductionposted by Kelly Pimmel on
I'm working on a project currently that requires exterior security cameras.
Should I include signs on the facade, when I calculate the LDP?
NC-2009 SSc8:Light Pollution Reductionposted by Daniel Strömberg on
Hi, I am working on a building that has commercial activities on the street level floor and offices on the rest of the floors, the project is places in Lz4..
Waterfront sites
NC-2009 SSc8:Light Pollution Reductionposted by James Weingarten on
Can a project boundary extend into a lake? I have a Department of Natural Resources building located on a lakefront. They have a public boat landing on site.