Forum quick links
62MZ Calculator for v4
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Rasita Masalskyte on
The prerequisite form states that 62MZ Calculator can be used as an alternative to Minimum Air Quality Performance Calculator and it can found under the prerequisite's Resources tab in the Credit L
Thermal Comfort Controls
NC-v4 EQc5:Thermal comfortposted by LEED Pro Consultant on
We are working on a project mainly dedicated to showers (83) and changing rooms (20) of a very large complex, with no workspaces within it, Could the project comply with this credit by excluding th
Preproject water bodies
ND-Plan-v4 SLLp3:Wetlands and water body conservationposted by Sarah Kearney on
Hello, What does 'preproject' really mean? Our project is located near a river. Currently there is one building with docks within 50 ft. of the water.
Modeling Assumptions for Cold, Dark Shells
CS-v4 EAp2:Minimum energy performanceposted by Michelle Rosenberger on
Hi Marcus, For previous warehouse CS projects with little to no installed mechanical and electrical systems (typically freeze protection, a few ventilation fans, and exterior lighting) we have assu
Monitoring and Inspection of Irrigation System
EBOM-v4 SSc5:Site managementposted by RYAN BEN SABILALA on
For SS Credit Site Management, the performance requirement says: "Monitor irrigation systems manually or with automated systems AT LEAST EVERY TWO WEEKS during the operating season and correct any
CI v4 Enhanced Energy Performance Sample Form
CI-v4 EAc2:Optimize energy performanceposted by Judhajit Chakraborty on
This is more of a statement, but I wanted to bring to attention the fact that the LEED CI v4 sample form on the usgbc website (below) for Optimize energy performance contains duplicates of the form
Car wash in parking garage
EBOM-2009 WEc1:Water Performance Measurementposted by Rasita Masalskyte on
Hi all, We have a case where there is an office ("main" building) and a separate parking garage (that serves the office) within LEED project boundary.
Enhanced Refrigerant Mgmt credit
NC-v4 EAc6:Enhanced refrigerant managementposted by Michelle Markus on
The ‘Enhanced Refrigerant Management’ credit it mentions a formula to comply with in order to be eligible for the point.
Bicycle Facilities - Bicycle Network
NC-v4 LTc6:Bicycle facilitiesposted by Vasileios Kalfountzos on
Hello everyone, I am currently working on a project located on a relatively industrialised area. That being said, due to the nature of the area there aren't any bicycle networks around the area.
Low-emitting requirements for fabrics?
Retail-CI-v4 EQc2:Low emitting materialsposted by Joanna Peacock on
Hi, My project is a retail fit-out where they are introducing bespoke-made furniture such as sofas and stools.