Topic | Recent |
---|---|
Letters to Material Suppliers & othersLEED for Homes (LEED-H) Forumposted by Donald Morrill on Oct 4, 2012, 12:08 am
Dear Tristan, Last reply: Peggy White, Nov 2, 2012, 12:11 pm |
|
Updating the LEEDOnline form after being acceptedNC-2009 EAp2: Minimum Energy Performanceposted by Maya Karkour on Oct 31, 2012, 11:04 am
Dear All, If the USGBC awards 4 points under EA Credit 1, but then the design team decides to add significant lighting to the project which will increase the Proposed consumption (and... Last reply: Marcus Sheffer, Nov 2, 2012, 9:33 am |
|
Pedestrian ConnectivityPilot-Credits PC9: Street Networkposted by Shiva Prakash on Nov 2, 2012, 9:29 am
I agree with comments made regarding the intent of the credit including pedestrian access. It seems to me that this is where the Street Network Pilot Credit can distinguish itself from other... |
|
Cellulose-based paper productsNC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Anders Olson on Oct 30, 2012, 9:09 am
The project I am working on has specified a number of products that contain cellulose-based paper, including decorative laminates, signage material and ceiling tiles. Some of them also contain... Last reply: Josh Jacobs, Nov 2, 2012, 8:13 am |
|
Does PPR piping need insulation?NC-2009 EAp2: Minimum Energy Performanceposted by Rudolph Carneiro on Nov 1, 2012, 2:42 pm
We have run into a situation with piping material used in a hotwater distribution system. Our client is using Polypropelene piping. (PPR) Last reply: Marcus Sheffer, Nov 1, 2012, 5:48 pm |
|
Energy Modeling for DMV Inspection StationNC-2009 EAp2: Minimum Energy Performanceposted by Maria Fiorelli on Nov 1, 2012, 4:29 pm
We have a project in question that is DMV office and vehicle inspection station. The vehicle inspection lanes side of the building are approximately 50% of the total project square footage. The... Last reply: Marcus Sheffer, Nov 1, 2012, 5:13 pm |
|
Calculating FTECalculating FTEsposted by Tom Hurst on Oct 26, 2012, 4:41 pm
I've reviewed several reference guides and I've just gotten myself more confused regarding calculating... Last reply: Susan Walter, Nov 1, 2012, 5:05 pm |
|
LEED Interpretation #10248 Requiring Residential Kitchen ExhaustNC-2009 IEQp1: Minimum indoor air quality performanceposted by Kimberly Frith on Nov 1, 2012, 4:44 pm
The new... |
|
Calculating cupolas, spires and other unique roof structuresNC-2009 SSc7.2: Heat island effect - roofposted by Keith Amann on Sep 20, 2012, 3:23 pm
I have a 100 year old... Last reply: Susan Walter, Nov 1, 2012, 3:59 pm |
|
Irrigation during drought conditionsNC-2009 WEc1: Water Efficient Landscapingposted by Lauren Ford on Jul 21, 2011, 10:57 am
Our project has limited turf areas that will require irrigation. We have a small irrigation system supplied by a rainwater cistern sized to provide required volume per LEED requirements. However... Last reply: Jenny Heim, Nov 1, 2012, 1:32 pm |