Topic | Recent |
---|---|
LED Lamps in Luminaires Designed for Other LampsCI-2009 EAc1.1: Optimize energy performance - lighting powerposted by Elizabeth Eason on Aug 14, 2012, 3:53 pm
We have a project with 2 different pendant fixtures that the Owner really wants to use - but they are designed for MR-16 and incandescent lamps. It appears that, according to ASHRAE 90.1-... Last reply: Bill Swanson, Nov 9, 2012, 4:45 pm |
|
Accessibility for SeniorsPilot-Credits PC34: Design for Adaptabilityposted by Lance Hillegas on Nov 9, 2012, 4:09 pm
Our project is an age and income restricted apartment building for low income seniors. The Pennsylvania state program under which we designed the project already mandated adaptability for... |
|
UnmetLoadHours- Do we have clarity yet?NC-2009 EAp2: Minimum Energy Performanceposted by Jean Marais on Nov 7, 2012, 7:22 am
The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet? For example: Last reply: Marcus Sheffer, Nov 9, 2012, 3:17 pm |
|
LEED Excel spreadsheet protected?Schools-2009 IEQc8.1: Daylight and views - daylightposted by Sara Goenner Curlee on Nov 9, 2012, 12:19 am
I'm trying to update the LEED daylight spreadsheet but it seems to be protected. I'm resubmitting after design review comments and I only want to make chnages to what I already submitted, not... Last reply: Eddy Santosa, Nov 9, 2012, 12:02 pm |
|
EQUIPMENT CAPACITY OVERSIZINGNC-2009 EAp2: Minimum Energy Performanceposted by PAWAN DAHIWAL on Nov 9, 2012, 1:48 am
I AM BEGINEER IN THIS FIELD. I HAVE A LITTLE DOUBT ABOUT EQUIPMENT CAPACITY OVERSIZING. Last reply: Marcus Sheffer, Nov 9, 2012, 10:22 am |
|
building dashboardSchools-2009 IDc1: Innovation in Designposted by Eri Spaulding on Nov 8, 2012, 2:17 pm
We are installing a building dashboard at the School's main entrance Lobby which will display energy consumption in real-time and compare with a baseline. This information will be accessible to... Last reply: Eri Spaulding, Nov 9, 2012, 10:21 am |
|
Alternative Compliance- LEED Reviewer ResponseSchools-2009 IEQc4.2: Low-Emitting Materials—Paints and Coatingsposted by Alison Y Rivenburgh on Jan 20, 2011, 3:45 pm
For the first time ever we have gotten the review comment that if even just one product follows alternative compliance, then all the products must be submitted as alternative compliance...which... Last reply: Kimberly Cullinane, Nov 9, 2012, 9:57 am |
|
100% open space regulationNC-2009 SSc5.2: Site development - maximize open spaceposted by Simon Chantal on Nov 8, 2012, 4:46 pm
What happens when the local code states that 100% of undevelopped space must be covered with grass or plants? Does it mean that I cannot achieve this credit since I can't exceed local zoning... Last reply: Susan Walter, Nov 9, 2012, 8:29 am |
|
IEQp1- A3 Table Mechanical Ventilation 100%OANC-2009 IEQp1: Minimum indoor air quality performanceposted by Todor Boyadzhiev on Aug 4, 2012, 7:56 am
Hello All, I have noticed the following while filling in this table: There is NO fieled where one can fill in the Project Design Outdoor Airflow for EACH SEPARATE ROOM. At the... Last reply: susan eguia, Nov 8, 2012, 8:01 pm |
|
EAc5 Exemplary PerformanceNC-2009 EAc5: Measurement and Verificationposted by Jodie Clarke on Nov 8, 2012, 5:20 pm
The guidance for exemplary performance specifies the NC, CS and Schools rating systems. I would like to get credit for following Option 2 and 3 for Healthcare. Does anyone know if... Last reply: Marcus Sheffer, Nov 8, 2012, 5:46 pm |