The definition of Unmet Load Hours has been vague for quite some time. ASHRAE 90.1 2010 was supposed to address this issue. Do we have some resolution about this yet? For example:
1) Do we count the sum of all the unmetloadhours for all the zones, or just the zone with the most unmetloadhours (this was a problem for 200 zone models)?
2) What is the tolerance of the zone temperature to the zone setpoint before the timestep is counted as unmetloadhour time, and what is it based on.
3) Is there an allowance for "pull down time", i.e. the time that it takes for the zone to reach setpoint after recoving from the setpoint change after night setback. During this time the loads will be unmet.