Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Project diversion rate v. facility rate

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Deborah Ebersole  on 

If a project's diversion rate is greater than 75% but the RCI certified facility's diversion rate is less than 75% during project construction is the project still eligable to achieve all MRc2 poin

1
Thu Jan 12, 2017, 6:47 pm

Proximity to rail station

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Sheryl Swartzle  on 

Our one and only bus, which stops right outside our project entrance, is a 10 minute drive in heavy traffic (meaning many rides would be less than 10 minutes) but 3.5 miles to a Metro Rail station.

1
Thu Jan 12, 2017, 9:44 pm

Review Team structure

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Charles Nepps  on 

I've always been curious how exactly the "Review Teams" are put together and function.

1
Thu Jan 12, 2017, 8:52 pm

Table PIf3-1 Space Usage Type - Owned vs Leased

NC-2009 PIf3:Occupant and Usage Data
posted by  Terrapin BrightGreen  on 

Hi could you confirm whether the "Owned/Leased" column is meant to reflect the project owner's usage management versus the building owner's usage?

1
Mon Jan 16, 2017, 2:11 pm

Elevated Airtrain station

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Judhajit Chakraborty  on 

How does this MPR impact elevated station projects?

1
Mon Jan 16, 2017, 2:27 am

Continuous Monitoring Sensors

EBOM-v4 EQc3:Thermal comfort
posted by  Laura Danzig  on 

Hi there, a quick question regarding the locations of the sensors/measurements required for this credit.

1
Wed Mar 8, 2017, 8:59 pm

Manufacturing - prorate energy model

NC-2009 EAp2:Minimum Energy Performance
posted by  Dave Hubka  on 

Hello Marcus, Projects pursuing CS certification are allowed to prorate the model based on owner control.

1
Fri Jan 13, 2017, 3:28 pm

Different equipment types or all equipment units in scope

CI-2009 EAp3:Fundamental Refrigerant Management
posted by  Edgar Arevalo  on 

For a project I'm currently working on, there are 4 CRAC units and 1 split system AC, both water-cooled.

1
Wed Jan 18, 2017, 10:50 pm

Use of bidets in an office bathroom for NC 2009 project

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Guillermo Brunzini  on 

As far as I know, bidets are considered process water fixtures, so do not need be included in the water saving calculation, is that correct?

1
Sun Jan 15, 2017, 7:23 pm

ID 10209 Mixed-use Building with office not residential use

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Jeffry Magnuson  on 

Our project is a 122,900 sf building for a single office user. There is 5,000 sf of retail space at the ground floor, currently not leased.

1
Tue Jan 17, 2017, 10:19 pm