Forum quick links
Brazilian equivalent standard
CI-2009 EAp2:Minimum Energy Performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
PI Form 2: MPR7
CI-2009 MPR7:Must comply with a minimum building area to site area ratioposted by Aline Luther on
For a project of a commercial interior (commercial office in a commercial building) the gross floor area correspond to the total area of the office?
V4 District Thermal Energy
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Holmes on
What guidelines should be used for district thermal energy systems in v4 when using option 1, specifically combined heat and power systems?
Option 2 applicability to a Shopping Mall larger than 9290 m2
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi all, I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).
Exterior lighting power allowance for an open-mall
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi all, I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell). The common areas include an illuminated open mall.
Buildings w/ programmatic dependency/architectural cohesiveness
CS-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I have a client that is developing an open-air type shopping center (i.e., the tenant stores are arranged in blocks that open to exterior interconnecting walkways) and is willing to pursue LEED cer
Indoor Water Use Reduction_Well water
CS-v4 WEc2:Indoor water use reductionposted by Giuseppina Amorusi on
Hi everybody, I was envolved in LEED v4 C&S certification. I would know if in Credit Indoor Water Use Reduction it’s possible to consider well water accumulated in water tank as alternative wat
Area clarification
CS-2009 EAp2:Minimum Energy Performanceposted by Magda Aghababyan on
Hi, We have Core & Shell project while calculating the area of the locations, Pif and EAp2 have difference approximately 4% please let us know what is the maximum percentage deviation. Thank y
precertification vs certification differences in regularly area
posted by Catharina B on
Hi All My project is after precertification, there all Pif's are approved. Now during the construction the quontity of regularly area has been changed.
Lighting power density in tenants
CS-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
According to LEEDv4 reference guide, tenants' lighting system must be modeled identically in the proposed building and in the baseline, as specified by Appendix G (unless energy savings are being c