Forum quick links
Rug
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Alicia Costas Freire on
Hello, I am working on a project where it is proposed to lay a rug directly on top of the raised floor in some areas.
Group or single project?
posted by David Lazaro on
Hello, We are pursuing LEED EBOM v2009 for an office complex. The project was built at the same time and has two twin buildings, with independent HVAC systems.
Social equity within the community
NC-v4 INc1:Innovationposted by Miriam Ramirez Baumgarten on
Hi, Our project is pursuing the Pilot credit "Social equity within the community" with Option 1: Complete The SEED Evaluator Parts 1 and 2.
Project located in a building with a very low fresh air rate
Retail-NC-v4 EQp1:Minimum indoor air quality performanceposted by Valentin Grimaud on
What if the project is located inside a 30-year old building with AHU supplying less than 10% fresh air rate? As we have to use the centralized ventilation system and we couldn't make any change t
Chilled water flow and pipe sizes
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jayakumar Pamuri on
Hi All, I am here to post my query about chilled water system,flow and pipe sizes.
project with courtyard walls...
Pilot-Credits PC14:Walkable Streetsposted by Frank Yao on
We have a small project with a courtyard with an area pretty much doubling the building footprint which has a wall (concrete wall, not a fence) all along the peripheral yard.
SSc2 - Can on-campus uses apply towards "basic services"?
NC-2009 SSc2:Development Density and Community Connectivityposted by Jordan Petersen on
We are currently attempting to achieve SSc2 Development Density + Connectivity on a University Campus for the construction of a number of student housing units.
ESC plan
NC-v4 SSp1:Construction activity pollution preventionposted by Ana Paula Quiros on
Hello, There is a hotel that might look certification and has 2 floors already built, then the construction stopped and they want to add now 3 more floors.
Existing parking lot, new LEED space
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Susan Reid on
Our project is a build-out in an existing non-LEED building in a suburban office park - there is a shared parking lot for several buildings and we are not adding any NEW spaces.
Bus Instead of Shuttle
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Rachel Manoguerra on
Our project is looking into using a mass transit center that is less than two miles from the project for this credit.