Forum quick links
Semi-conditioned Baseline requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Michael Ozenich on
I have a heating-only warehouse (with small conditioned office) I'm modeling for C&S 2009.
District Energy Systems (DES) in LEED CI
CI-2009 EAp3:Fundamental Refrigerant Managementposted by James Lee on
Hi, I am working on LEED CI EAp3, and we have central chiller units out of project boundary. I saw the article saying "DES having no effect on any LEED CI EA prerequisite or credit". Does that mea
Blind
CI-v4 EQc5:Thermal comfortposted by Ameet AA on
Hi, Can blind be considered as control for thermal comfort? Thanks.
Steel lockers BIFMA testing
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Anna Korinkova on
We have steel lockers on our project which shall be produced by a steel company and painted in the factory. They claim to use low VOC or zero VOC paints.
mixed non-potable and potable water used for irrigation
EBOM-2009 WEc3:Water Efficient Landscapingposted by Pablo Fortunato Suarez on
The project is using predominantly non-potable water for irrigation (~97%). Systems include recycled water from sewage treatment plant and rain water harvesting.
online form terminologies
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Pablo Fortunato Suarez on
The SSc4 online form requires inputs for the following: 1) "total number of regular building occupants" 2) "total number of regular building occupants required to receive the survey" 3) "total numb
Energy Model For A Campus
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I am working on a Leed campus project where there is 3 separate buildings which each consist of retail units on the ground floor and office units above.
Waste to energy in LEED v3
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Darya Lukicheva on
Hello. I'm now working on a large project (180 000 m2) certification under LEED 2009 NC.
Number of Bus Routes Required
NC-v4 LTc5:Access to quality transitposted by Carolyn Risley on
To confirm, is it possible to achieve LTc5 with just one bus route so long as the minimum number of weekday/weekend trips are satisfied?
tenant requirements to maintain compliance with IEQc8.1 and 8.2
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Gail Napell on
Has anyone had comment from GBCI when taking these credits for a speculative C&S office building? We provide a proposed tenant layout that shows the interior complying with these credits.