Forum quick links
glare control features in retail
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Anna Bak on
Hi, I'm working on the building that on the ground floor has an entrance lobbby with a desk for receptionist and some retail space. On the upper floors we have an office space.
Open Space
NC-v4 SSc3:Open spaceposted by Jorge Lopez de Obeso on
Hi, in order to getting to know the new V4 we are taking a look at each credit and start to getting familiar with them. The leed reference guide doesn't use the same project in both examples for fu
worksheet language
Healthcare-v4 IPc1:Integrative processposted by Duncan Griffin on
The worksheet is somewhat vague about the language that would satisfy LEED reviewers - for example, Site Conditions Baseline assumptions or Massing/Orientation Baseline assumptions could be broad o
no permanent workstations
CS-2009 MPR5:Must comply with minimum occupancy ratesposted by Agnieszka Rylska on
My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations.
Existing HVAC system efficiency
CI-v4 EAp2:Minimum energy performanceposted by Richard Mathews on
Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.
LEED certification submittal
NC-v4 MPR3:Must comply with project size requirementsposted by Pam Lynch on
Hello, I am currenty studying for the LEED GA exam.
Recommended values for Met and CLO and size of zones
NC-v4 EQc5:Thermal comfortposted by Sandra Holmström on
Hi! Is there any recommended value för Met and CLO that you must use when you perform your calculation of PMV/PPD etc? Is there any recommended size of the zones that require thermal comfort Cont
Diversity factors in ventilation rates calculation
Schools-2009 IEQp1:Minimum IAQ Performanceposted by mingyu Zhang on
Our project in China is a K-12 school which consist of 2 learning buildings, a sport center and a performing center. When we compare the ventilation rates calculated according to ASHRAE 62.1 with L
Separation Method For Garages
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Ciaran McCabe on
Hi, What should we enter as the Separation Method for a Carpark with mechanical supply and exhaust which is open to outside via the carpark ramp. Thanks.
Gas Instantaneous Water Heater
NC-2009 EAp2:Minimum Energy Performanceposted by Nicolas Martinez Ochoa on
Hello, I’m working in an office building in Bogotá, Colombia. The building has 11 gas instantaneous water heaters, with 48 kW capacity each.