Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

glare control features in retail

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Anna Bak  on 

Hi, I'm working on the building that on the ground floor has an entrance lobbby with a desk for receptionist and some retail space. On the upper floors we have an office space.

1
Thu Oct 20, 2016, 1:34 pm

Open Space

NC-v4 SSc3:Open space
posted by  Jorge Lopez de Obeso  on 

Hi, in order to getting to know the new V4 we are taking a look at each credit and start to getting familiar with them. The leed reference guide doesn't use the same project in both examples for fu

1
Wed May 31, 2017, 2:38 pm

worksheet language

Healthcare-v4 IPc1:Integrative process
posted by  Duncan Griffin  on 

The worksheet is somewhat vague about the language that would satisfy LEED reviewers - for example, Site Conditions Baseline assumptions or Massing/Orientation Baseline assumptions could be broad o

1
Tue Jan 17, 2017, 8:49 pm

no permanent workstations

CS-2009 MPR5:Must comply with minimum occupancy rates
posted by  Agnieszka Rylska  on 

My Client is renovationg a few floors of his office. The renovated floors would only contain canteen, gym and conference rooms without any permanent work stations.

0

Existing HVAC system efficiency

CI-v4 EAp2:Minimum energy performance
posted by  Richard Mathews  on 

Let's say I'm doing a tenant job in an existing office building, and the tenant is served by an existing rooftop AC unit.

1
Wed Jan 18, 2017, 11:51 pm

LEED certification submittal

NC-v4 MPR3:Must comply with project size requirements
posted by  Pam Lynch  on 

Hello, I am currenty studying for the LEED GA exam.

1
Wed Oct 12, 2016, 5:10 am

Recommended values for Met and CLO and size of zones

NC-v4 EQc5:Thermal comfort
posted by  Sandra Holmström  on 

Hi! Is there any recommended value för Met and CLO that you must use when you perform your calculation of PMV/PPD etc? Is there any recommended size of the zones that require thermal comfort Cont

0

Diversity factors in ventilation rates calculation

Schools-2009 IEQp1:Minimum IAQ Performance
posted by  mingyu Zhang  on 

Our project in China is a K-12 school which consist of 2 learning buildings, a sport center and a performing center. When we compare the ventilation rates calculated according to ASHRAE 62.1 with L

1
Tue Jan 24, 2017, 1:57 pm

Separation Method For Garages

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ciaran McCabe  on 

Hi, What should we enter as the Separation Method for a Carpark with mechanical supply and exhaust which is open to outside via the carpark ramp. Thanks.

1
Thu Oct 13, 2016, 8:00 pm

Gas Instantaneous Water Heater

NC-2009 EAp2:Minimum Energy Performance
posted by  Nicolas Martinez Ochoa  on 

Hello, I’m working in an office building in Bogotá, Colombia. The building has 11 gas instantaneous water heaters, with 48 kW capacity each.

1
Thu Oct 13, 2016, 1:34 pm