Commercial Interior; EAc1.3
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Hi Marcus, Could you please advice me about the following situation: Regarding Option 1 of credit EAc1.3 of CI, the reviewers are requesting an extra CO2 sensor to be added for the densely occupied
Site adjacent to 5 lane highway - with no On-0ff ramp.
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Joyce Kelly on
If the Distribution center is less than 1-mile driving distance of 5 lane, wide shouldered Carlyle turnpike aka Route 11 (center lane = turning lane), does that qualify as a highway for the purpo
A shared storm water tank with other projects
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Francesco Allaix on
I have a LEED project where they plan a storm water tank that will be a shared one with two other buildings next to the LEED project building.
Double Ridership - access to transit station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Erin Holdenried on
If a bus servicing your LEED project connects to a bus transfer station (within 2 miles/10 min) of the project site.
Calculating stored rainwater available
NC-2009 WEc3:Water Use Reductionposted by Yusuf Turab on
We are having some trouble coming up with the calculation for rainwater stored and reused annually.
cottages on poles on water
NC-v4 MPR1:Must be in a permanent location on existing landposted by Emmanuel Pauwels on
We are looking into the possibility to certify a holiday resort located on an island.
Approach for documentation with 2 Commissioning Agents
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Aishwarya Balagopal on
The project is registered as a Campus project with a Master Site including 4 new buildings, an underground parking structure, and landscape improvements.
160815 FLUSH-OUT - LEED V4 IAQ ASSESSMENT PRACTICE EXAM QUESTION
CS-v4 SSc7:Tenant design and construction guidelinesposted by P Beulah on
Please read the query below and explain if I've misunderstood something. The Reference Guidance book clearly states: Option 1 Flush-Out Path 1 Before Occupancy: Total 14,000 cubic ft of outdoor ai
WELL credits and LEED Innovation points
Pilot-Credits IPpc88:LEED O+M Starter Kitposted by Meredith Chambers on
Can a WELL credit be used as a LEED Innovation point in v4? If so, can the list shown in Appendix C, Table A2 of the WELL Building Standard v1 Reference Guide be used to show compliance with v4 Pe
SSc4.1
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Magda Aghababyan on
We have campus project from building entrance to the 1st bus stop near about 520m. Is it possible to apply this credit.