Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

residential kitchen - spray nozzle

NC-2009 WEc3:Water Use Reduction
posted by  Erin Holdenried  on 

Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?

1
Thu Aug 11, 2016, 3:36 pm

MR credit: Building Disclosure

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Francisca Herrera  on 

In relation to the Educational Session on EPD that you lead through USGBC, can you please tell me if the EPD compliant with LEEDv4 that you cover through this course, requires that the program unde

0

Data center Lighting - Building area method

NC-2009 EAc1:Optimize Energy Performance
posted by  SAMY Chamy  on 

Dear All:- we are doing LEED NC project for data center which one is correct base case LPD for data center in building area method which lighting categories we take if we go with space by space m

1
Thu Aug 11, 2016, 2:17 pm

Cooler and freezer storage

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Mercè Llorca  on 

Hello, We are working on a project that is a combination of offices and food production.

1
Wed Sep 14, 2016, 8:35 pm

Food Service Equipment

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Rachel Manoguerra  on 

I am working on a LEED for Healthcare v2009 project, and I'm wondering if I have to track food service equipment?

1
Sun Aug 27, 2017, 12:25 am

Existing MultiFamily High Rise-Exclude Occupied Commerical Space

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Laura Steinbrink  on 

We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.

1
Tue Mar 7, 2023, 4:30 pm

EAc1 Credits Using DES Option 1 + A lot of Renewables

NC-2009 EAp2:Minimum Energy Performance
posted by  Reniel Barroso  on 

We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.

1
Tue Aug 16, 2016, 4:18 pm

EAc1 points using DES Option 1 + A lot of Renewables

NC-2009 EAc1:Optimize Energy Performance
posted by  Reniel Barroso  on 

We have a project opting to get the maximum 19 credit points in EAc1.

1
Wed Aug 31, 2016, 3:45 pm

Energy Star Related Product

Retail-CI-v2009 EAp2:Minimum energy performance
posted by  Wei Zeng  on 

Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling

1
Wed Oct 26, 2016, 9:58 pm

n/a

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Maria Rios  on 

Hey, We are trying to prepare all documentation to get this credit, and we are having some difficulties due to the next consideration: "Plan(s) and/or elevation(s) depicting the location of all m

1
Tue Aug 23, 2016, 4:06 pm