residential kitchen - spray nozzle
NC-2009 WEc3:Water Use Reductionposted by Erin Holdenried on
Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?
MR credit: Building Disclosure
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Francisca Herrera on
In relation to the Educational Session on EPD that you lead through USGBC, can you please tell me if the EPD compliant with LEEDv4 that you cover through this course, requires that the program unde
Data center Lighting - Building area method
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear All:- we are doing LEED NC project for data center which one is correct base case LPD for data center in building area method which lighting categories we take if we go with space by space m
Cooler and freezer storage
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Mercè Llorca on
Hello, We are working on a project that is a combination of offices and food production.
Food Service Equipment
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by Rachel Manoguerra on
I am working on a LEED for Healthcare v2009 project, and I'm wondering if I have to track food service equipment?
Existing MultiFamily High Rise-Exclude Occupied Commerical Space
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Laura Steinbrink on
We have an existing 13 Story Downtown Multifamily LEED NC v2009 registered project consisting of 210,000 sf and 200 units which will be gutted.
EAc1 Credits Using DES Option 1 + A lot of Renewables
NC-2009 EAp2:Minimum Energy Performanceposted by Reniel Barroso on
We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.
EAc1 points using DES Option 1 + A lot of Renewables
NC-2009 EAc1:Optimize Energy Performanceposted by Reniel Barroso on
We have a project opting to get the maximum 19 credit points in EAc1.
Energy Star Related Product
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Wei Zeng on
Hello: I am working on a convenience store applying for LEED CI Retail 2009 certification, the project plans to design two outdoor air-cooled condensing unit which would be used as the cooling
n/a
Pilot-Credits SSpc55:Bird collision deterrenceposted by Maria Rios on
Hey, We are trying to prepare all documentation to get this credit, and we are having some difficulties due to the next consideration: "Plan(s) and/or elevation(s) depicting the location of all m