Forum quick links
MPR3 - Hotel in Mixed Use Building
CI-2009 MPR3:Must use a reasonable site boundaryposted by Sara Zoumbaris on
Hi - We are working on a (new construction) CI project for a hotel which is located in a larger building with multiple tenants.
Exhaust-only ventilation?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Laura Charlier on
Does anyone know if there is a LEED interpretation that allows exhaust-only ventilation in multifamily units under LEED-NC? Thanks!
Service hot water pumps in the baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Jordan Kirrane on
I am doing an ASHRAE 90.1-2007 PRM analysis.
Purchasing Calculator updated 4/8/2016
EBOM-v4 MRc1:Purchasing - ongoingposted by Trista Brown on
USGBC released a revised Purchasing Calculator with an updated weighted average formula for lamps. The link to the calculator in the Resources tab will take you to the updated version.
Purchasing Calculator updated 4/8/2016
EBOM-v4 MRc2:Purchasing - lampsposted by Trista Brown on
USGBC released a revised Purchasing Calculator with an updated weighted average formula for lamps. The link to the calculator in the Resources tab will take you to the updated version.
Reuse of window glass for contstruction fill
CS-2009 MRc2:Construction Waste Managementposted by Maria Glädt on
We're involved in a Project where the Contractor wants to send the window glass to a facility that crushes the glass.
Modeling DCV Savings for Proposed Building
CS-2009 IEQp1:Minimum IAQ Performanceposted by Bernard Sagaiyaraj on
To account savings using DCV, we understand that Baseline building ventilation is to be modeled using ASHRAE 62.1 whereas Proposed building ventilation is to modeled as designed. However our Basel
LEED Project Baundary
CS-2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
Hi, We have a 16 story Building which is going into major renovations and we are thinkin on registering it as C&S for the certification. The issue is that the Owner shares part of the ground fl
Separate Storage Enclosure
NC-2009 PIf2:Project Summary Detailsposted by David Hryvniak on
I am working on a project that has a small, separate generator enclosure/ maintenance building. It is not connected to the building, and it is not conditioned or ventilated.
LEED Project Baundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
Hi, We have a 16 story building which is going under major renovation. The new Owner wants to get the building certified as C&s. The issue is that the ground floor will be shared with a Hotel.