Recycling area for MR Pre-req in a small historical building
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Veronica Reed on
Hello We are developing a ver small 12 room hotel in a historical landmark building in the historic center of Quito, all houses in the block from late 1800's, thus the building was a former single
Technical Advice
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Eleftherios Zacharakis on
Hi, we used ENERGY STAR Portfolio Manager to estimate the CO2 emissions of a project.
Tenant Space Energy Modeling
CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
To comply with EA_p2 we are goint to develo the energy simulation of the Tenant Space Scope of Work. My questions are: 1.
Peak Transients
Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by timothy thomas on
The following is review comment I received for SS 4.2. "Refer to the comments within PIf3: Occupant and Usage Data.
Option 1 - What to include in Site Area calc
CS-2009 SSc2:Development Density and Community Connectivityposted by Jay Murray on
I have 15 properties that fall within my Density Radius. I did not include the public roads in this square footage calculation, nor did I include a public parking lot that fell within my radius.
Re-Appeal for a data center
posted by Jordan Kirrane on
Hi, We have a project that underwent an appeal in order to get EAp2/c1. The results of the Appeal (D+C) were that the prereq was granted, but not the points from the credit.
Recycling Areas for Multifamily/commercial project
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Rob Hink on
I am working on a multifamily housing project with commercial spaces. The commercial spaces are on the first 2 floors. There will be individualized retail space and office space.
Sedum as native plants
CS-2009 WEc1:Water Efficient Landscapingposted by Dave L on
Hi, I have been advised that the sedum plants would meet this credit on green roofs due to the fact that the plants would be indigenous for landscaping in general.
Retail in a large building
Retail-CI-v2009 EAc5:On-site renewable energyposted by Maria Isabel Conde on
We are certifying a small retail store that is almost 5 percent of the total building area. The retail store shares a chilled water plant with the rest of the building.
Transients for complex occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by David Browne on
In trying to determine the peak transients and daily average transients for a building with several distinct user groups, my client has given me a schedule of when each group will use the building