Forum quick links
Emission Reporting (ISO 14064/ Portfolio Manager)
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Esteban Martinez on
Hi, We are working in a project in Colombia.
How i can use Portfolio Energy Star to Colombia
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Esteban Martinez on
Hi, We have a project that aims LEED EBOM certification. The project is a school. We enter the data of energy consumption and water consumption in Portfolio Energy Star.
Circulation space around the building core
CS-v4 EQc4:Daylightposted by Julien Richard on
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
FTE calculation and use associated for visitors
Healthcare-v2009 WEp1:Water use reductionposted by Annabelle Lam on
I am working on a hospital project where I have both inpatients and visitors.
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling Tower Water Managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Exempt area of 10% in a Group Project
posted by Gabriel Frasson on
We have a site that contains two buildings that are being certificate as a campus project. In the ground floor of Tower A there are some stores that we want to exempt of the certification project (
Regularly Occupied Space Area Calculation
NC-2009 PIf3:Occupant and Usage Dataposted by ESRA OZKONUKSEVER on
Dear All, While calculating the squarefootage of the regularly occupied spaces in a project building, do we use the gross or the net area of the spaces? Thank you!
Previous coal mine area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Agnieszka Rylska on
Is a site which is located on a teritory of a previous coal mine considered perviously developed?
The three dimensional orientation of the luminaire
Pilot-Credits SSpc7:Light pollution reductionposted by Aly Rawji on
Can you please provide a sample for this, what is required for "The three dimensional orientation of the luminaire (plan/ elevation)"?