Forum quick links
Coating on process equipment applied onsite
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by LEED Pro Consultant on
Hello all, I am working on an industrial manufacturing building where a piece of the process equipment will be painted onsite as part of the installation requirements, but as it is part of the eq
Exterior space, partially enclosed - Application of Std.
NC-2009 IEQp1:Minimum IAQ Performanceposted by Mauricio Ramirez on
Hello in a Museum, we have an uderground open space, that, on our understanding is an exterior space, as it is outside the Access vestibule.
Legacy LEED AP's
posted by Patty Lloyd on
Do legacy LEED AP's need to take the LEED GA exam if they wanted to re-test to become a specialized LEED AP?
Envelop Commissioning
CI-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
The LEED Online template provides selections for HVAC systems commissioning (4pts) or commissioning with monitoring (5pts). The LEED Reference Guide describes Enhanced Systems Commissioning (3-4pts
Building Type
NC-2009 EAc2:On-Site Renewable Energyposted by Geraldine Assmus on
I'm trying to certify a Retail Store under LEED ID-Retail 2009 in Buenos Aires, Argentina. There is no info in Leed User for this credit.
Base building system
CI-2009 IEQp1:Minimum IAQ Performanceposted by Graham Langton on
Hi, To what extent does the base building system need to be entered into the VRP calculator?My CI project spaces is carried out space by space but that level of detail for other tenants isn't ava
Pick up and Drop Facility
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Priyadarsi Das on
We have a CI project which is basically a part of a factory development. The Admin Building is going for the LEED CI rating.
SSc4.3: "publicly posted at the entrance of the parking area"
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Greengrade User on
Our project is a classroom and faculty office building with an occupancy calculated at 89 FTE and 707 peak transients located on an urban college campus .
Kitchen Hoods with gas make-up air unit
NC-2009 EAc1:Optimize Energy Performanceposted by James Sullivan Jr. on
I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?
SSc4.2 alternative
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Greengrade User on
I understand USGBC will allow NC-v4 LTc6: Bicycle facilities as an alternative compliance path to SSc4.2.