CS-2009 MRc5:Regional Materialsposted by Osama Hassan on
Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options.
Is this Pilot credit closed?
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Stella Stella on
Hi All, we are pursuing a LEED BD+C project and would like to register for this credit but it says the Pilot credit closed?
Energy star
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Yaser Al Sharif on
I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to replace our eq
Does an indoor sewage pit need exahust for EQc5?
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Kristopher Lashley on
We have a project where there is a sewage pit located on floor P2 of the parking garage.
Energy star
CI-2009 EAp2:Minimum Energy Performanceposted by Yaser Al Sharif on
Energy star I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to
LEED for Neighborhood Development + Walkable Project Site
Pilot-Credits PC14:Walkable Streetsposted by Nikki Wildman on
We just wanted to share a little of our experience with this credit.
Exterior Lighting Baseline vs Proposed
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Unruh on
I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?
initial fit-out vs alteration?
Retail-CI-v2009 PIf2:Project Summary Detailsposted by Andrew Bennett on
What is the difference between initial fit-out and alteration square footages?
90% controls for open office systems furniture
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Brian VanAllen on
As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?
Storm dry pond onsite overflows to stormceptor
posted by Marie-France Duthilleul on
Pre condition - open field and grass, a few trees. Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area.