Core and Shell Scope & Tenant Scope

CS-2009 MRc5:Regional Materials
posted by  Osama Hassan  on 

Hi, Project is registered on Core & Shell rating System CS V2.0. When i was working on Regional Material Credit MRc5, I found two Options.

0

Is this Pilot credit closed?

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Stella Stella  on 

Hi All, we are pursuing a LEED BD+C project and would like to register for this credit but it says the Pilot credit closed?

1
Mon Aug 10, 2015, 10:17 pm

Energy star

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Yaser Al Sharif  on 

I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to replace our eq

0

Does an indoor sewage pit need exahust for EQc5?

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Kristopher Lashley  on 

We have a project where there is a sewage pit located on floor P2 of the parking garage.

1
Tue May 26, 2015, 1:34 pm

Energy star

CI-2009 EAp2:Minimum Energy Performance
posted by  Yaser Al Sharif  on 

Energy star I am working on cl commercial project , when we resisted to the leed certificate we didn't have any energy star equipment's in our building , but to achieve more points we decided to

1
Wed Jun 17, 2015, 7:53 pm

LEED for Neighborhood Development + Walkable Project Site

Pilot-Credits PC14:Walkable Streets
posted by  Nikki Wildman  on 

We just wanted to share a little of our experience with this credit.

0

Exterior Lighting Baseline vs Proposed

NC-2009 EAp2:Minimum Energy Performance
posted by  Maria Unruh  on 

I'm trying to understand baseline exterior lighting versus the proposed. My calculations show that my proposed is less than my baseline, is this okay?

1
Tue May 26, 2015, 7:42 pm

initial fit-out vs alteration?

Retail-CI-v2009 PIf2:Project Summary Details
posted by  Andrew Bennett  on 

What is the difference between initial fit-out and alteration square footages?

0

90% controls for open office systems furniture

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Brian VanAllen  on 

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?

0

Storm dry pond onsite overflows to stormceptor

LEED Canada Forum
posted by  Marie-France Duthilleul  on 

Pre condition - open field and grass, a few trees. Post Condition: Development of a large military type vechicle building with loading docks and paved circulation drive area.