Forum quick links
Project Sites within a LEED ND Boundary
posted by Philippa Cameron on
There are several sites located within our LEED ND boundary which are at an early project stage, all are large expansions of existing buildings and will still be under design at the time of submiss
CORE area and SHELL area
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Yodi Danusastro on
How to specify the IEQc 4.1 credit area limit for CS in SHELL area? in case for tenant spaces (that is still unoccupied), or the anchor tenant that has construction in parallel.
Baseline for Blow-out Fixtures
CS-2009 WEp1:Water Use Reductionposted by study topenergy on
According to the Water Use Reduction Additional Guidance (April 2013), when selecting the "Blow-out fixture" option, the 3.5 gpf baselne should also be used for the installed case.
Non recyclables in recycling stream
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Vanessa Seibert on
I think I know the answer but just want to double check.
Parking space ownership
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual owners?
Parking spaces owned
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Gustavo De las Heras Izquierdo on
I see this credit mainly oriented to shopping malls and office buildings, but how should I address a project where all parking spaces are going to be SOLD to individual buyers?
Credit Complance/Justification in Spanish
posted by Peter Gibney on
For justifiying compliance with LEED credits for a Project in Spain, can supporting documentation, management plans, etc.
Target Finder: Design vs Target
NC-2009 EAp2:Minimum Energy Performanceposted by Rock Ridolfi on
All, new to energy modeling and reviewing the EAp2 online template trying to figure out the required inputs and reports for the Target Finder section, Design vs Target.
LEED "Owner" (vs. Leasing)
Retail-NC-v2009 PIf3:Occupant and Usage Dataposted by Serena Wray on
I am working with a national retailer who controls the design of their own stores and all LEED decisions that are made regarding those stores.
Total material cost
NC-2009 MRc5:Regional Materialsposted by Sahar Abi-Ziki on
Hello, In our project, we decided to estimate real total material cost without equipments and labor for division 2-10. What kind of proof the contractor needs to present in this case?