posted by  Katherine Ann Resurreccion  on 

Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.

1
Tue Feb 10, 2015, 1:41 pm

Different outdoor air flow rates between Models

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Santiago Rodriguez  on 

Hello, We hace just received the preliminary review comments for a Data Center.

1
Tue Feb 10, 2015, 4:38 pm

Massage/Sauna/Swimming pool

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  LEED Pro Consultant  on 

Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.

1
Tue Feb 10, 2015, 5:54 pm

Water Quality

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Nathan Anderson  on 

Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.

1
Fri Feb 12, 2016, 5:05 pm

Reference Building – Try #2

Pilot-Credits MRpc63:Whole building life cycle assessment
posted by  Dirk Kestner  on 

Resurrecting Mark Webster’s previous thread – I am finalizing a PC 63 submission and I’m curious what strategy others have used to define the reference building.

1
Sun Apr 12, 2015, 10:45 am

50% periouvs paving

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Magda Aghababyan  on 

May be this is a very basic question. But I would like to know from you all, how can we determine whether a open grid paving block is 50% previous or not?

1
Fri Nov 27, 2015, 2:15 am

Indoor air quality test methods

NC-v4 EQc4:Indoor air quality assessment
posted by  Tyler Zhu  on 

From my understanding, in order to pass the test for PM2.5 and PM10, EPA Compendium Method IP-10 has to be used.

1
Wed Feb 11, 2015, 7:18 pm

LIFT Lobbies to be included in VRP Calculations

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Preethi Ranjith  on 

i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.

0

P: avarage rainfall event

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  ESRA OZKONUKSEVER  on 

Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w

0

MRc5 Material Tracking/Documentation

CS-2009 MRc5:Regional Materials
posted by  Maggie Hogan Skaug  on 

RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.

0