Forum quick links
Solar PV System Degradation
NC-2009 EAc2:On-Site Renewable Energyposted by Katherine Ann Resurreccion on
Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.
Different outdoor air flow rates between Models
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
Hello, We hace just received the preliminary review comments for a Data Center.
Massage/Sauna/Swimming pool
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by LEED Pro Consultant on
Hello, we are working on a residential project and we would like to know if amenities such as sauna, massage and swimming pool areas are considered as regularly occupied areas. Thank you.
Water Quality
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Nathan Anderson on
Lets say the 90% runoff volume for the project area is 10,000 c.f. If only 50% of the project area drains to the bmp which is designed to treat 10,000 c.f. at 100% efficiency but only 7,900 c.f.
Reference Building – Try #2
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Dirk Kestner on
Resurrecting Mark Webster’s previous thread – I am finalizing a PC 63 submission and I’m curious what strategy others have used to define the reference building.
50% periouvs paving
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Magda Aghababyan on
May be this is a very basic question. But I would like to know from you all, how can we determine whether a open grid paving block is 50% previous or not?
Indoor air quality test methods
NC-v4 EQc4:Indoor air quality assessmentposted by Tyler Zhu on
From my understanding, in order to pass the test for PM2.5 and PM10, EPA Compendium Method IP-10 has to be used.
LIFT Lobbies to be included in VRP Calculations
CI-2009 IEQp1:Minimum IAQ Performanceposted by Preethi Ranjith on
i want some clarity on whether it is necessary to include Lift lobbies in VRP calculation to demonstrate compliance under IEQp1 and IEQc2? These lift lobbies are not regularly occupied.
P: avarage rainfall event
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by ESRA OZKONUKSEVER on
Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w
MRc5 Material Tracking/Documentation
CS-2009 MRc5:Regional Materialsposted by Maggie Hogan Skaug on
RE: usgbc.org/leedonline, CS2009 MRc5 I do not see a form or calculator for material tracking or other forms/upload requirements for this credit documentation.