Prefinished wood flooring: alternative to emissions testing?

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Sue Clark  on 

We are specifying an FSC-certified wood floor that has a white pigmented wax finish.

0

CS 2009 EAp2-c1 ACP spreadsheet

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, In the project I'm modeling (C&S), I took the opportunity to use the CS 2009 EAp2-c1 ACP spreadsheet with integrated calculator. I've come to reach 46% of Energy cost influenced by C

1
Mon Dec 15, 2014, 4:07 pm

Custom furniture for LEED project

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Roxanne Button  on 

I haven't found any other discussions about this - apologies if I missed it somewhere: my client is a custom furniture manufacturer and they are bidding on a LEED CI project.

1
Mon Sep 24, 2018, 8:23 pm

Supplementary mechanical ventilation in naturally ventilated

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Michael Smithing  on 

Our project is primarily naturally ventilated and meets the requirements of Section 5.1 in non-core areas.

0

Golf Course

CS-2009 SSc1:Site Selection
posted by  AtSite Inc  on 

Our project is being developed on a former golf course.

0

ETS During Construction

NC-v4 EQp2:Environmental tobacco smoke control
posted by  L W  on 

Does the ETSC prerequisite apply during construction as well?

1
Thu May 7, 2015, 10:09 pm

Hi,
I believe I already know

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Bernardo Ruiz Montoya  on 

Hi, I believe I already know the answer but I want to make a double check with you.

1
Tue May 5, 2015, 10:19 am

adjustable Dual Flush valve

NC-2009 WEc3:Water Use Reduction
posted by   Faisal   on 

Hi, we are evaluating a dual flush valve for WC, which give us 6 & 9 Litres per flush(adjustable) which aggregates to 7 litres per flush, our project requirement is 3.023 Litres per flush(0.8

0
1
Wed Dec 17, 2014, 3:15 pm

Counters

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, We are certifying an airport and we would like to know if the counters need to have task lighting. The IEQ Space Matrix does not include this type of building. Thank you

1
Mon Feb 2, 2015, 4:31 pm