Forum quick links
DEC - EBOM
EBOM-2009 WEc4:Cooling Tower Water Managementposted by babu rajendran on
My project getting chilled water from District energy center which has cooling towers.
Peak and Daily Average Transient
posted by Jin Park on
I recived review report last weekend. The comment is follwing. "Peak transient occupants have not included in the form." I would like to know the difference between Peak and Average Transient Visit
ventilation flow rate
CI-2009 IEQc2:Increased Ventlilationposted by ilkyaz ceren güçlü on
Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas?
Not surprising but unfortunate.
posted by Christopher Schaffner on
This appears to be a decision made at the executive level, rather than a consensus decision. I couldn't help but note the IPCC report issued the day after the USGBC press release.
Pleased to hear of the extension.
posted by Anne Porter on
Unfortunately, I have been unable to "convince" a facility manager that LEED EB was worth the cost.
LEED v3 and v4 Online Overhaul - Top Priority
posted by Gary Shlifer MS, LEED AP BD+C, Homes on
How many valuable hours have you or your firm wasted waiting, reloading, navigating, bringing up templates, correcting templates, fixing errors, at LEED Online?
Double sidewalk and bike path
Pilot-Credits PC14:Walkable Streetsposted by Agnes Vorbrodt on
I'm wondering how to treat the
MIXED MODE Ventilation
CI-2009 IEQp1:Minimum IAQ Performanceposted by Sathish Kumar on
May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?
Tenant work and submittal of credits
CS-2009 IEQp1:Minimum IAQ Performanceposted by Lise Dannesboe on
I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.
Minimum and average negative pressure measurements
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Bilge Ceylan on
In our project, the design pressure is well above the minimum required negative pressure in our smoking rooms with respect to the adjacent areas.