Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

DEC - EBOM

EBOM-2009 WEc4:Cooling Tower Water Management
posted by  babu rajendran  on 

My project getting chilled water from District energy center which has cooling towers.

1
Wed Dec 10, 2014, 5:35 pm

Peak and Daily Average Transient

General forums
posted by  Jin Park  on 

I recived review report last weekend. The comment is follwing. "Peak transient occupants have not included in the form." I would like to know the difference between Peak and Average Transient Visit

1
Tue Nov 18, 2014, 3:42 pm

ventilation flow rate

CI-2009 IEQc2:Increased Ventlilation
posted by  ilkyaz ceren güçlü  on 

Hi, We work on a project in Turkey and I have a trouble about calculations on technical areas. Is it subject %30 increase the flow rate in technical areas?

0

Not surprising but unfortunate.

General forums
posted by  Christopher Schaffner  on 

This appears to be a decision made at the executive level, rather than a consensus decision. I couldn't help but note the IPCC report issued the day after the USGBC press release.

1
Mon Nov 10, 2014, 11:18 pm

Pleased to hear of the extension.

General forums
posted by  Anne Porter  on 

Unfortunately, I have been unable to "convince" a facility manager that LEED EB was worth the cost.

0

LEED v3 and v4 Online Overhaul - Top Priority

General forums
posted by  Gary Shlifer MS, LEED AP BD+C, Homes  on 

How many valuable hours have you or your firm wasted waiting, reloading, navigating, bringing up templates, correcting templates, fixing errors, at LEED Online?

1
Mon Nov 10, 2014, 7:09 pm

Double sidewalk and bike path

Pilot-Credits PC14:Walkable Streets
posted by  Agnes Vorbrodt  on 

I'm wondering how to treat the

0

MIXED MODE Ventilation

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Sathish Kumar  on 

May i know, what are the documents are providing clarity on designing the mixed mode ventilation strategies?

0

Tenant work and submittal of credits

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Lise Dannesboe  on 

I am currently working on a Core & Shell project, which is a major renovation, aiming at LEED SILVER.

0

Minimum and average negative pressure measurements

CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Bilge Ceylan  on 

In our project, the design pressure is well above the minimum required negative pressure in our smoking rooms with respect to the adjacent areas.

0