Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LPD Calculation Technical/Plant/Maintenance Rooms

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Ian McCall  on 

Dear all, Are technical, plant, maintenance, goods stockage rooms included in this LPD (Lighting Power Density) calculation? Are staff stairwells included? Thank-you Ian

1
Wed Apr 15, 2015, 6:42 pm

And/Or Inside the Building

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Omar Elrawy  on 

Dear all, My first question is that which part exactly from the Reference guide states that the entryway system should be placed inside the building?

1
Mon Sep 8, 2014, 12:41 am

Conference Rooms with folding partitions

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Christine Spendiff  on 

I have a large conference room with a folding partition to create two smaller conference rooms. Do I run the simulation with the partition open (one large room) or closed (two small rooms)?

1
Tue Sep 9, 2014, 5:09 pm

Analysis areas for large building

NC-v4 EQc7:Daylight
posted by  Jody Lee Potvin-Jones  on 

Hi, For EQc7: Daylight.

1
Thu Sep 18, 2014, 3:10 pm

On-site, third party owned solar

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Nicholas Bristow  on 

Our project has an on-site, third party owned Solar PV system.

1
Mon Sep 8, 2014, 3:17 pm

Calculating FTE for a Dorm

Calculating FTEs
posted by  Nelina Loiselle  on 

Hello, I was wondering if someone can help me with calculating the FTE for a Dorm. All of the full and part-time employees are residents within the building.

0

Janitor's closet away from occupant work areas

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Zeyu Yao  on 

I am working on a project where one of the janitor's closets is located in the kitchen area.

1
Fri Sep 12, 2014, 12:56 pm

Wood in Retail Stores C&S

CS-2009 MRc6:Certified Wood
posted by  Ian McCall  on 

Dear "LEED" -ers , I am working on a C&S project that has a large retail area.

1
Tue Sep 9, 2014, 3:27 pm

Table 1.4

NC-2009 EAp2:Minimum Energy Performance
posted by  Khaled Fouda  on 

I have couple of questions about filling table 1.4.7: 1- Table 1.4.7A asks for the total cooling capacity, I use HAP 4.6 and the cooling capacities are calculated according to ASHRAE 90.1.

1
Tue Sep 9, 2014, 6:04 pm

How are doors calculated?

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  David Gruss  on 

Are doors excluded in the same way as windows are excluded? If not, would new doors in existing frames count against your percentage reused number for a wall area? Cheers, David

1
Mon Dec 8, 2014, 6:19 pm