Hi,

For EQc7: Daylight. Option 1, spatial daylight autonomy (sDA):
In IES LM-83-12 section 2.2.6 Blinds/Shades Operation it says that the analysis area for obtaining the blind operation schedules may never exceed 10,000 sf. Currently we are designing a massive building of 400.000m2 . For a building of this magnitude will it then be sufficient, to obtain the operation schedules for representative sections of the building, and then map those to the rest of the building?