Forum discussion

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems

On-site, third party owned solar

Our project has an on-site, third party owned Solar PV system. The RECs have been sold to the local utility and replacement RECs per LEED Interpretation #10161 have been purchased for the project. Since the PV system is third party owned, would it be required for the project owner to commission the system as part of the LEED certification?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Mon, 09/08/2014 - 15:17

Interesting question, but I think it might rest with how it is connected into the building. If the system is tied directly into the building systems, then I think that interface would need to be commissioned. If there is any metering associated with the monitoring of the PV, that should be confirmed.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.