Dear all, My first question is that which part exactly from the Reference guide states that the entryway system should be placed inside the building? My second question is that should it be (10 ft long and inside the building?) or (10 feet long or inside the building?) as I may understand from the CIR 10098 phrase: "An exception to the 10 ft length and/or indoor location is acceptable ..."
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.