Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Energy Star's Portfolio Manager Tool

CS-2009 PIf1:Minimum Program Requirements
posted by  Kathryn Van Nelson  on 

Who exactly registers a project with Energy Star's Portfolio Manager Tool?

1
Mon Jan 19, 2015, 7:19 pm

Manufacturer Declaration

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Lilian Seow  on 

The tile contractor says they can't disclose their floor tile and stone supplier information.

1
Sat Jul 26, 2014, 12:05 pm

parking rainwater

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  jorge calderon  on 

For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the

1
Wed Jul 2, 2014, 12:42 pm

90% refer to what?

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Jens Apel  on 

I am wondering what the 90% in option 2 refer to. If I collect and use rainwater, I may use 90% of the annual rainwater on the site.

0

applying only for EAc5.2 not EAc5.1

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Anna Bak  on 

Hi! Do you know if we can apply for EAc5.2 without applying for EAc5.1? The Investor doesn't want to pay for the model callibration, therefore we will not apply for EAc5.1.

1
Thu Jun 12, 2014, 2:27 pm

clarification question on credit

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Melissa Elkins  on 

Our Engineering firm didn't include our water heating system in the original commissioning report, so our credit needs to be clarified - they did conduct a functional test so I'm wondering if I jus

1
Fri Jun 13, 2014, 12:23 pm

Disinterested Sub-contractor of MEP Design Firm?

NC-2009 EAc3:Enhanced Commissioning
posted by  Anthea Ng  on 

Hello. For achieving EA C3 Enhanced Commissioning, Wwe noted the clause in guidebook "Must not be an employee of the design firm, though he or she may be contracted through them".

1
Fri Jun 13, 2014, 12:37 pm

Ventilation - Proposed and Baseline per ASHRAE 62.1-2007?

NC-2009 EAp2:Minimum Energy Performance
posted by  Todd Tewksbury  on 

Hi! I am conducting a LEED v2009 EAp2/c1 energy model for a nonresidential building that is more than 5 floors.

1
Tue Jun 17, 2014, 1:46 pm

Expansion project FLUSH OUT

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Jorge Torres-Coto  on 

We have a project that is an expansion to an existing facility. It is NOT an addition.

0

Submitting for Review & Terminolgy

Living with LEED Online - quirks, bugs and hiccups
posted by  Charles Nepps  on 

Just submitted a CI v2009 project for final (combined) review. Initially I was getting error messages that it could not be submitted unless all Prereqs & Credits were marked "complete".

1
Mon Jun 16, 2014, 9:23 am